Lighting Controls Save Energy

Lighting Controls Save Energy 

With Lutron High Bay Athlite Fixtures, Moravian College was able cut previous electrical output by 83 percent in their recreational gym.

Moravian is a small, residential college in Bethlehem, PA, founded in 1742 — the sixth oldest college in the United States. It is a school steeped in the liberal arts tradition and deeply committed to its students. To strengthen the sense of campus community, the school had long planned to renovate its Athletic and Recreation Center. Construction involved updating its competition and recreational gyms, and adding a 10,000-squarefoot fitness center for faculty and students.

As part of the overall construction and renovation project, the college identified the need for an energy-efficient lighting retrofit that would allow centralized control and programming of the lighting in all the athletic facilities, and would also deliver significant lighting energy savings. Work had to be done quickly, during the summer break, in order to minimize disruption to the students and the athletic program.

In both gyms, Moravian replaced inefficient, high-intensity discharge (HID) lighting with Lutron High Bay Athlite fixtures and digital fluorescent dimming ballasts. The school also installed preset lighting controls, eliminating the guesswork previously used to create the right light level.

The energy savings — reported via Lutron GreenGlance energy reporting software — were staggering. Compared to the original HID lighting, the new system has already saved 83 percent of the electric output in the recreational gym and 71 percent in the competition gym.

“Our students appreciate the fact that the court is more evenly lit, and that the new lights are silent. The loud buzz from the old lights is completely gone. That means it’s better for the athletes,” notes Mary Beth Spirk, the head coach of the Women’s Basketball Team at Moravian.

www.lutron.com

This article originally appeared in the issue of .

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • Surging Demand for Student Housing Fuels Major Campus Investment Opportunities

    University leaders throughout the U.S. are accelerating plans to modernize and expand student housing as enrollment stabilizes and demand for on-campus living rebounds. Recent data from the National Center for Education Statistics indicates that total postsecondary enrollment is projected to grow through the end of the decade, with undergraduate enrollment alone expected to increase by more than 8 percent by 2030.