Las Positas College

Student Services and Administration Building

Las Positas College Student Services and Administration Building 

PHOTOS © TIM GRIFFITH

The new Student Services and Administration Building is a galvanizing addition to Las Positas College. Amidst the rolling hills of Livermore, CA, the spacious campus enjoys tremendous views, but horizontal expansion had led to scattered and remote services. The stakeholder engagement process involved two dozen meetings with end-users to best co-locate, right size and reposition program elements. The design, by Steinberg Architects, resulted in functional adjacencies that best leverage interdepartmental communication and maximizes the efficiency of services.

The solution entails a two-story structure that responds to environmental factors while addressing the many intricacies associated with circulation, way-finding and hierarchy. To take advantage of the visual and physical connections between the interior and the exterior, a double-height glass-enclosed gallery was created that allows for entries on both floors. This space serves as a central organizing element that scales and visibly creates an indelible link between the building and the newly defined campus quad.

The project provides a welcoming and prominent campus gateway and consolidates student services centrally to capitalize on service delivery, while also collecting campus administrative offices in one location. The Office of the President strategically overlooks the Campus Boulevard, which cohesively links the upper and lower campus. Natural light is filtered through expansive window and glass wall systems to enhance visual cues and nurture a healthy work environment. Each of three vice presidents is located within a suite of offices and workstations clustered around a central reception area. All departments share common resources such as conference rooms, workrooms and a staff break room.

The lively cafeteria on the ground floor contains a separate café, while a folding partition provides a discrete faculty/staff dining area. This concept of co-locating food services with staff offices brings vibrancy and energy to the building while providing opportunities for student interaction and engagement with administration.

This article originally appeared in the issue of .

Featured

  • El Paso District Breaks Ground on New Elementary School

    The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027.

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.

  • Moline-Coal Valley School District to Consolidate Two Schools into New Facility

    The Moline-Coal Valley School District in Moline, Ill., recently broke ground on a new elementary school that will consolidate the students and staff from two existing schools, according to local news. Robert Ontiveros Elementary School will serve as the new home for Lincoln-Irving Elementary School and Willard Elementary School.

  • UT System Approves First Funds for New Campus

    The University of Texas System Board of Regents recently approved funds to build the first facility of a new campus in far west Fort Worth, Texas, according to university news. UTA West will serve as a branch of the University of Texas at Arlington and is scheduled to open in fall 2028.