AVI at URI

The Parking and Transportation Department at the University of Rhode Island provides information on its website on an Automatic Vehicle Identification (AVI) system, which grants access to gated Faculty and Staff parking lots. The website indicates that it is a tag similar to an EZ Pass, placed on a vehicle windshield, that allows access to gated lots without swiping an ID. Automatic Vehicle Identification Radio Frequency (RF) technology (AVI) is used at gated Faculty and Staff parking locations across the URI campus to automatically open entry gates.

AVI is used by URI instead of card access systems because card access systems alone can be slow and inconvenient to use. The AVI system is extremely fast, authenticating access in fractions of a second. AVI devices are 3.5-inches long by 2.5-inches wide — approximately the size of a credit card — and must be secured to vehicle front windshields. URI indicates the following benefits result from the use of the AVI system:

  • It operates successfully in all campus gated Faculty and Staff parking lots.
  • It saves the time and eliminates the frustration of fumbling for forgotten or misplaced ID cards.
  • It controls access to an area, encouraging only legal parking in the area.
  • The devices can be disabled easily if stolen.
  • AVI devices can be programmed for any time period of use and do not require batteries.
  • AVI holders can continue to use the device as long as they are affiliated with the university, and the AVI can be turned off when no longer in use.

This article originally appeared in the issue of .

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • Surging Demand for Student Housing Fuels Major Campus Investment Opportunities

    University leaders throughout the U.S. are accelerating plans to modernize and expand student housing as enrollment stabilizes and demand for on-campus living rebounds. Recent data from the National Center for Education Statistics indicates that total postsecondary enrollment is projected to grow through the end of the decade, with undergraduate enrollment alone expected to increase by more than 8 percent by 2030.