O'Connell Robertson Earns CEFPI Architecture Merit Award

Austin, Texas — O’Connell Robertson’s design of the new Success High School in Round Rock ISD earned one of two 2015 Architecture Merit Awards presented by the Council of Educational Facility Planners International (CEFPI) Southern Region Chapter during the group’s annual conference in San Antonio on Saturday (April 11).

Award entries were evaluated according to criteria in each of the following categories: community environment, learning environment, physical environment, and planning process.

The 68,000 SF campus (located at 500 Gattis School Road in Round Rock) serves high school students who desire acceleration, need evening classes to better fit their personal schedules, or are in at-risk situations. The school was designed to provide maximum flexibility to support varying curriculum and class sizes with flexible and innovative learning spaces, integrated labs, design studios, small group rooms, and a discovery center that replaces the traditional library. A child care center for student parents also doubles as a teaching space for the Early Childhood Education curriculum. The campus features numerous sustainability strategies designed to achieve a LEED Silver rating.

“We are proud of this award that recognizes our partnership with RRISD in designing a progressive and unique educational environment that helps prepare all students for success after high school,” said Amy Jones, principal-in-charge of the Success High School project.

Featured

  • Photo courtesy of Kraus-Anderson

    Minnesota District Completes $49.7M Addition, Renovation Project

    St. Paul Public Schools in St. Paul, Minn., recently announced the completion of a $49.7-million addition and remodeling project at two district schools, according to a news release.

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.

  • Spaces4Learning Trends & Predictions for Educational Facilities in 2026: Part I

    We asked, you answered, and the results are in! Last year, we put out a call for submissions to collect our readership’s opinion on trends and predictions for K–12 and higher education facilities in 2026.