Consistent Clocks, Happy Campus

The River Valley Community College in Claremont sits on 141 acres along the New Hampshire-Vermont border near the Connecticut River.

Skip Davis became the facility maintenance director after a long career in teaching and engineering. The moment he started the job, he knew a synchronized clock system was desperately needed. “When I first came here, you couldn’t find two clocks in the entire building with matching time. It was a major frustration to teachers and students. As a former teacher, I know how important maximum learning time is for our students. They come first. We’re preparing them for the business world and proper time management is a learned skill.”

Skip went online and started checking around for synchronized clocks. “I knew we didn’t have the budget for professional installation of a new wired clock system. And it wouldn’t make sense to try to re-use the old wiring from the ancient clock system that hadn’t worked in years. I found exactly what I was looking for in a wireless clock system because we could install it ourselves.”

“When I was looking for this clock system, I got three quotes. I usually go with the lowest cost, but I make sure the company guarantees the product. American Time was the only vendor who sent someone out to visit me. Brent conducted a site survey so accountability was on him and the company. I knew they’d stand behind their product.”

River Valley Community College found the robust SiteSync IQ wireless clock system by American Time synchronized the entire facility. “The teachers are so used to it now; they forget how bad it used to be. If a clock is off even a little, I get a call. That shows how consistent the clock system is. Now that I have clocks under control, I work on other projects on my list.”

www.american-time.com

This article originally appeared in the issue of .

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • Surging Demand for Student Housing Fuels Major Campus Investment Opportunities

    University leaders throughout the U.S. are accelerating plans to modernize and expand student housing as enrollment stabilizes and demand for on-campus living rebounds. Recent data from the National Center for Education Statistics indicates that total postsecondary enrollment is projected to grow through the end of the decade, with undergraduate enrollment alone expected to increase by more than 8 percent by 2030.