Conservation and Choice Make Lighting Upgrades Easy

Lighting Upgrades

Great performance along with guaranteed energy conservation made Cree the obvious choice when it came to replacing 2,553 lights at Toledo Public School facilities.

The Toledo Public Schools (TPS) Maintenance and Operations Department supports 42 schools in Toledo, Ohio. As the director of Maintenance and Operations, Quintin Reynolds is responsible for finding new ways to save energy. Reynolds along with key staff member, Ron Miller, and TPS’s energy consultant, Palmer Conservation Consulting, worked to save energy by replacing 2,553 outdoor metal halide and high-pressure sodium lights with Cree LED luminaires.

In addition, TPS wanted to turn the opportunity into a teachable moment for students by building an interactive energy dashboard providing real time energy usage data.

The Maintenance and Operations Department with Palmer Conservation Consulting chose Cree LED lights because of the product longevity, low maintenance and the 10-year limited warranty.

“Cree had a 10-year warranty when everyone else offered seven years or less,” says Miller. “The lighting quality is there and the fixtures are good quality — well built.”

“TPS likes the performance, price point, and how it looks compared to other lights on the market,” says Miller. “In addition, the lighting enhanced the look of the schools. Cree luminaires come in many colors so we could choose colors to complement the architecture of each school.”

During the lighting project, outdoor lighting at 42 schools was upgraded in a one-to-one replacement with Cree LED lights. Using existing poles, OSQ Series luminaires replaced flood and area lights in the parking lot, CPY Series replaced canopy lights at the school entrances, Cree EdgeTM Series replaced walkway lights, and XSP Series Wall Packs replaced existing accent lighting.

The crisp, white light of Cree’s luminaries create a safe atmosphere for students, administrators and visitors. As important, the Cree luminaires are backed by Cree’s 10-year industry-leading limited warranty, providing investment protection.

www.cree.com/lighting

This article originally appeared in the issue of .

Featured

  • Minnesota District Partners with Kraus-Anderson on Four Construction Projects

    Stillwater Area Schools in Lake Elmo, Minn., recently announced a partnership with Kraus-Anderson for construction projects at four schools in the district, according to a news release. The projects’ funding comes from a $175-million referendum passed in November 2023.

  • Aims Community College to Build Workforce Innovation Center

    Aims Community College in Greeley, Colo., recently announced that it has broken ground on its new Aims Workforce Innovation Center (AWIC), according to a news release. The facility for workforce development, entrepreneurship, and education has a scheduled opening date of fall 2026.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • Enjoy Tax and Energy Savings with the Right Ceiling Solutions

    Thanks to recent innovations pairing mineral fiber ceiling panels with phase change material technology (PCM), architects, designers, facility managers, and other key players in construction and renovation projects are re-thinking the role ceilings play in supporting environmental objectives—especially energy savings.

Digital Edition