Student Center Goes From Dreary to Vibrant

Student Center Goes From Dreary to Vibrant

Transforming the student center at Waukesha County Technical College required new and vibrant lighting. Solatube was up to the challenge.

The Waukesha Campus of Waukesha County Technical College (WCTC) in Waukesha, WI, includes a service building, which housed a student center in need of new life.

“The cave-like environment of the student gathering area was very oppressive. It was truly incredible to see the transformation of the space once the Solatube units were installed,” says Keith Johnson, owner of Brighter Concepts.

Dubbed “the cave” for its dark and gloomy atmosphere, the student center was unpopular with students. With a budget of $600,000, the school sought to transform the dark and dreary environment into a bright and cheerful place where students would want to congregate.

According to Matthew Kerr, IIDA, ASAI, senior associate and interior designer at Zimmerman Architectural Studios, the renovation’s main objectives were filling the space with natural light and creating auditory separation without disrupting the visual “openness” of the existing space.

Local Solatube Certified Commercial Distributor, Brighter Concepts, installed twelve Solatube SolaMaster 750 DS Core Units. The units integrated with LED lighting for nighttime use and maximum energy efficiency. Custom square-shaped fabric lanterns added a decorative element at the ceiling level.

According to Brooks Kyler-Eberlein, WCTC interior design instructor, the addition of Solatube Daylighting Systems took “the cave” from an underused, dark space to a vibrant, active hub for students. The use of natural light by day and LED light by night also provided WCTC with an efficient long-term solution to energy costs.

www.solatube.com

This article originally appeared in the issue of .

Featured

  • Opportunity by Design Framework

    Opportunity by Design

    Educational improvement efforts often focus on curriculum, instruction, assessment, professional development, and intervention systems while treating the physical school building as background. But school design is not a passive backdrop to learning — it is a structural lever for equity.

  • Embry-Riddle Completes Construction on Research, Lab Facility

    Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced the end of construction on a new research and lab facility on campus. The Center for Aerospace Engineering II (CAT II) will support aerospace research and technology development and broke ground last summer.

  • Chicago District Completes Construction on New Elementary School

    North Chicago School District 187 in North Chicago, Ill., recently held a ribbon-cutting ceremony for the new Forrestal Elementary School, according to a news release. The new school marks a major investment in military-connected students and families at Naval Station Great Lakes.

  • How Proactive Maintenance Can Transform Athletic Facilities into Strategic Assets for College Sports

    College athletics is entering one of the most transformative periods in its history. With NIL reshaping financial models and competitive expectations, athletic departments across the country are being asked to do more than ever with increasingly constrained resources.