Controlling Noise In Classrooms

Acoustical performance is vital ceiling selection criteria for classrooms. The reason: students must be able to hear and understand their teacher if they are to learn.

In the past, acoustical ceilings offered either good sound absorption to decrease unwanted sound levels in a classroom, or good ceiling attenuation to block unwanted sound intrusion from adjacent classrooms or corridors, but not both absorption and blocking in the same ceiling.

Now, the science behind the ceiling is able to offer a new generation of acoustical ceiling panels that provide an ideal combination of sound absorption as denoted by their Noise Reduction Coefficient (NRC) and sound blocking as denoted by their Ceiling Attenuation Class (CAC) in the same panel.

The NRC indicates the ability of a ceiling to absorb sound. It is expressed as a number between 0.00 and 1.00, and indicates the percentage of sound it absorbs. An NRC of 0.60 means a ceiling absorbs 60 percent of the sound that strikes it. A ceiling with an NRC less than 0.60 is considered low-performance, one with an NRC of 0.70 or greater, high-performance.

The CAC indicates the ability of a ceiling to block sound in one space from passing up into the plenum and transmitting back down into an adjacent space that shares the same plenum. The higher the number, the better the ceiling acts as a sound barrier.

A ceiling with a CAC less than 25 is considered low-performance, one with a CAC of 35 or greater, high-performance.

Regardless of whether it’s new construction or renovation, the best solution for both reducing the level of sound in a classroom and limiting sound intrusion into it is an acoustical ceiling panel that combines an NRC of 0.70 or greater and a CAC of 35 or greater.

This article originally appeared in the issue of .

About the Author

Sean Browne is principal scientist - Global Acoustics for Armstrong Ceilings.

Featured

  • Arizona District Breaks Ground on Community Training, Learning Center

    The Tolleson Union High School District (TUHSD) in Tolleson, Ariz., recently broke ground on a new Training & Learning Center (TLC) for both district professionals and the community at large, according to a news release. The 90,000-square-foot facility has an estimated completion date of spring 2027.

  • Minnesota District Opens New PreK–12 School

    Gibbon-Fairfax-Winthrop Schools in Gibbon, Minn., recently announced that construction is complete on a new, $68.9-million school for students in grades PreK–12, according to a news release.

  • Building Beyond Simulation: Creating Immersive Ecosystems for Healthcare Education

    Health sciences education is one of the fastest-growing facility types in colleges and universities. The demand for medical, nursing, and allied health professionals is driving the creation and renovation of medical simulation training facilities that provide students with real-world experience through advanced simulation-based learning.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.