I Can Hear Clearly Now

Hear Clearly

PHOTO © D13

While kids frequently leave you with the impression that they don’t notice anything that isn’t on their smart phone or screeching at them from a television set, that isn’t necessarily so. Sometimes even seemingly subtle changes can produce profound differences and, ultimately, recognition from usually oblivious youth.

Take a roomful of sixth graders at the Robert E. Lamberton Public School in Philadelphia. Dr. Kenneth Roy, senior principal research scientist at Armstrong Ceiling Systems, conducted a test at the school involving the acoustics in that sixth grade classroom. The class was videotaped; however, the teacher was the only one in the room told the reason for doing so.

Prior to making any changes in the room, Dr. Roy took sound measurements in the classroom. The existing classroom ceiling consisted of one-half inch thickness of fiberglass insulation sprayed over plaster. The reverberation rate of sound in the room, he discovered, was up to 1.3 seconds, far exceeding classroom acoustic (ANSI S12.60) standards. The sound was, quite literally, bouncing off the ceiling and walls.

Taking advantage of a long weekend, Armstrong installed a suspended acoustic panel ceiling in the classroom. New ceilings also were installed in the school’s cafeteria and the principal’s office.

When the sixth grade students returned to class, new sound measurements were taken. This time, the classroom met the ANSI standard for sound reverberation of 0.60 seconds.

The teacher indicated there appeared to be less fidgeting and talking during lessons. Her students seemed to be paying more attention. What was even more interesting was the reaction of the students. When asked if they’d noticed any changes, there was an immediate response — they noticed the improvement in the sound levels. Several also commented that the room was a lot brighter, and yet another student, who sat in the back of the room, said “I can hear (my teacher) a lot better today.”

This article originally appeared in the issue of .

Featured

  • UT System Approves First Funds for New Campus

    The University of Texas System Board of Regents recently approved funds to build the first facility of a new campus in far west Fort Worth, Texas, according to university news. UTA West will serve as a branch of the University of Texas at Arlington and is scheduled to open in fall 2028.

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.

  • ed tech conference calendar

    Upcoming Awards, Events & Webinars

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.