I Can Hear Clearly Now

Hear Clearly

PHOTO © D13

While kids frequently leave you with the impression that they don’t notice anything that isn’t on their smart phone or screeching at them from a television set, that isn’t necessarily so. Sometimes even seemingly subtle changes can produce profound differences and, ultimately, recognition from usually oblivious youth.

Take a roomful of sixth graders at the Robert E. Lamberton Public School in Philadelphia. Dr. Kenneth Roy, senior principal research scientist at Armstrong Ceiling Systems, conducted a test at the school involving the acoustics in that sixth grade classroom. The class was videotaped; however, the teacher was the only one in the room told the reason for doing so.

Prior to making any changes in the room, Dr. Roy took sound measurements in the classroom. The existing classroom ceiling consisted of one-half inch thickness of fiberglass insulation sprayed over plaster. The reverberation rate of sound in the room, he discovered, was up to 1.3 seconds, far exceeding classroom acoustic (ANSI S12.60) standards. The sound was, quite literally, bouncing off the ceiling and walls.

Taking advantage of a long weekend, Armstrong installed a suspended acoustic panel ceiling in the classroom. New ceilings also were installed in the school’s cafeteria and the principal’s office.

When the sixth grade students returned to class, new sound measurements were taken. This time, the classroom met the ANSI standard for sound reverberation of 0.60 seconds.

The teacher indicated there appeared to be less fidgeting and talking during lessons. Her students seemed to be paying more attention. What was even more interesting was the reaction of the students. When asked if they’d noticed any changes, there was an immediate response — they noticed the improvement in the sound levels. Several also commented that the room was a lot brighter, and yet another student, who sat in the back of the room, said “I can hear (my teacher) a lot better today.”

This article originally appeared in the issue of .

Featured

  • El Paso District Breaks Ground on New Elementary School

    The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027.

  • University of Kansas Opens $400M Football Stadium Reconstruction

    The University of Kansas in Lawrence, Kan., recently announced that the $400-million reconstruction of David Booth Kansas Memorial Stadium is complete in time for the 2025 football season, according to a news release. The university partnered with Turner Construction Company on the project.

  • Texas State University Completes Stadium Renovations

    Texas State University in San Marcos, Texas, recently announced that it has completed a series of additions and renovations to its football stadium, according to a news release. Formerly known as the Bobcat Stadium End Zone Complex, the Johnny and Nathali Weisman Football Performance Center is an 85,000-square-foot expansion featuring hospitality spaces, banquet spaces, exterior concourses, and upgrades to the field house.

  • Pudu Robotics Launches AI-Powered, Large-Scale Floor Sweeper

    Pudu Robotics recently launched the newest member of its MT1 series of robotic floor sweepers, the PUDU MT1 Max, according to a news release. The AI-powered, 3D perception robotic sweeper was designed for use in large, complex cleaning environments both indoors and semi-outdoors, like parking garages and semi-open building atriums.

Digital Edition