I Can Hear Clearly Now

Hear Clearly

PHOTO © D13

While kids frequently leave you with the impression that they don’t notice anything that isn’t on their smart phone or screeching at them from a television set, that isn’t necessarily so. Sometimes even seemingly subtle changes can produce profound differences and, ultimately, recognition from usually oblivious youth.

Take a roomful of sixth graders at the Robert E. Lamberton Public School in Philadelphia. Dr. Kenneth Roy, senior principal research scientist at Armstrong Ceiling Systems, conducted a test at the school involving the acoustics in that sixth grade classroom. The class was videotaped; however, the teacher was the only one in the room told the reason for doing so.

Prior to making any changes in the room, Dr. Roy took sound measurements in the classroom. The existing classroom ceiling consisted of one-half inch thickness of fiberglass insulation sprayed over plaster. The reverberation rate of sound in the room, he discovered, was up to 1.3 seconds, far exceeding classroom acoustic (ANSI S12.60) standards. The sound was, quite literally, bouncing off the ceiling and walls.

Taking advantage of a long weekend, Armstrong installed a suspended acoustic panel ceiling in the classroom. New ceilings also were installed in the school’s cafeteria and the principal’s office.

When the sixth grade students returned to class, new sound measurements were taken. This time, the classroom met the ANSI standard for sound reverberation of 0.60 seconds.

The teacher indicated there appeared to be less fidgeting and talking during lessons. Her students seemed to be paying more attention. What was even more interesting was the reaction of the students. When asked if they’d noticed any changes, there was an immediate response — they noticed the improvement in the sound levels. Several also commented that the room was a lot brighter, and yet another student, who sat in the back of the room, said “I can hear (my teacher) a lot better today.”

This article originally appeared in the issue of .

Featured

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

  • Minnesota Middle School Finishes $23.5M Addition and Modernization

    Highland Park Middle School in St. Paul, Minn., recently announced the completion of a $23.5-million addition and remodel project, according to a news release. Saint Paul Public Schools partnered with ATS&R Planners, Architects & Engineers for its design and Kraus-Anderson for its construction.

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • UT System Board of Regents Approves $108M Housing Complex

    The University of Texas System Board of Regents recently announced the approval of a new, $108-million housing complex at the University of Texas at El Paso (UTEP), according to a news release. The facility will stand four stories and have a total of 456 new beds for freshmen students.

Digital Edition