Lighting Upgrade Leads to Big Savings

Cree lighting in school parking lot

Toledo Public Schools realized a large energy savings by switching to Cree lighting, which also led to a large financial savings.

The Toledo Public School’s (TPS) Maintenance and Operations Department supports 42 schools. As the director of Maintenance and Operations, Quintin Reynolds is responsible for finding new ways to save energy. Reynolds along with key staff member, Ron Miller, and TPS’s energy consultant, Palmer Conservation Consulting, worked to save energy by replacing 2,553 outdoor metal halide and high-pressure sodium lights with Cree LED luminaires.

The Maintenance and Operations Department with Palmer Conservation Consulting chose Cree LED lights because of the product longevity, low maintenance and the 10-year limited warranty.

“Cree had a 10-year warranty when everyone else offered seven years or less,” says Miller. “The lighting quality is there and the fixtures are good quality — well built.”

“TPS likes the performance, price point, and how it looks compared to other lights on the market,” adds Ron Miller. “In addition, the lighting enhanced the look of the schools. The luminaires come in many colors so we could choose colors to complement the architecture of each school.”

The crisp, white light of Cree’s luminaries can create a safe atmosphere for students, administrators and visitors. As important, the Cree luminaires are backed by Cree’s 10-year industry-leading limited warranty, providing investment protection. By upgrading the outdoor lighting at all 42 schools with Cree LED luminaires, TPS reduced energy consumption by 2.8 million kWh .

Looking at Start High School, Cree is estimating that they will see a 69-percent energy savings based on watt reduction. Since Cree LED lights are virtually maintenance-free for 10 years, TPS expects a lifetime savings of $125,072 on maintenance costs by not having to send staff and trucks out to replace bulbs. Energy and maintenance combined, the savings equates to a 1.8-year payback period.

www.cree.com/lighting

This article originally appeared in the issue of .

Featured

  • Enjoy Tax and Energy Savings with the Right Ceiling Solutions

    Thanks to recent innovations pairing mineral fiber ceiling panels with phase change material technology (PCM), architects, designers, facility managers, and other key players in construction and renovation projects are re-thinking the role ceilings play in supporting environmental objectives—especially energy savings.

  • Tennant Company Launches Autonomous Floor Scrubber

    Cleaning equipment and solutions provider Tennant Company recently launched the new X6 ROVR, a mid-sized robotic scrubber designed for large commercial and light-industrial environments, according to a news release. The autonomous machine can clean up to 75,000 square feet peer cycle with minimal needs for manual assistance.

  • Florida Elementary School to Undergo $47M Reconstruction

    The School District of Osceola County in Kissimmee, Fla., recently announced a partnership with construction firm Skanska to reconstruct Reedy Creek Elementary School, according to a news release. The $47-million project will involve the new construction of a 96,000-square-foot academic center, renovating the remaining facilities, a full-site redevelopment, and demolishing portions of the existing school.

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

Digital Edition