What costs should be considered for flooring?

A floor covering, especially for today’s active learning environments, must be durable, maintain its appearance and support the desired instructional-intended design of that space. When considering these factors — and knowing a flooring surface is typically the largest of any surface in a space — specifying the right flooring product is important to get the most for long-term use.

When budgets are tight, it can be tempting to select low-cost or inexpensive flooring. This approach might save money upfront for material and installation cost, but it can have consequences on the back end. Lower-cost flooring may require more maintenance over time, or it might need replacing sooner than expected, costing more money in the long run.

When selecting flooring for an educational environment, facility experts should consider not only the upfront costs, but also the expected total “lifecycle cost of ownership” for that product.

Calculating this cost does not need to be time-consuming. Some industry associations and manufacturers offer tools to help facility executives with this important task, including online calculators that enable users to compare lifecycle costs across various flooring types, including hard surfaces, soft surfaces and textile composite floorings. This allows facility professionals to make informed decisions about product choices and associated costs. Going through the process can ensure that facility professionals maximize the dollars spent on their purchase.

When it comes to flooring, it’s important to know the costs beyond the initial material and installation — including maintenance time, tools and replacement considerations.

This article originally appeared in the issue of .

About the Author

Bob Bethel is the director of Business Development, Education, for J+J Flooring Group. J+J offers an online calculator, floorlifecost.com. Bob can be reached at [email protected] or 800/241-4586.

Featured

  • Chartwells Launches Campus Dining Evaluation Framework

    Contract food-service management provider Chartwells Higher Education recently announced the launch of BLUEPRINT, according to a news release. The evaluation framework was designed to provide a data-driven and customizable roadmap towards optimizing campus dining services and, by extension, the student experience.

  • Zurn Elkay Releases 2025 Sustainability Report

    Zurn Elkay Water Solutions recently announced the release of its annual sustainability report, according to a news release. The 2025 report discusses the organization’s efforts to maintain good environmental stewardship and the solutions provided in helping customers meet sustainability goals.

  • El Paso District Breaks Ground on New Elementary School

    The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).