What costs should be considered for flooring?

A floor covering, especially for today’s active learning environments, must be durable, maintain its appearance and support the desired instructional-intended design of that space. When considering these factors — and knowing a flooring surface is typically the largest of any surface in a space — specifying the right flooring product is important to get the most for long-term use.

When budgets are tight, it can be tempting to select low-cost or inexpensive flooring. This approach might save money upfront for material and installation cost, but it can have consequences on the back end. Lower-cost flooring may require more maintenance over time, or it might need replacing sooner than expected, costing more money in the long run.

When selecting flooring for an educational environment, facility experts should consider not only the upfront costs, but also the expected total “lifecycle cost of ownership” for that product.

Calculating this cost does not need to be time-consuming. Some industry associations and manufacturers offer tools to help facility executives with this important task, including online calculators that enable users to compare lifecycle costs across various flooring types, including hard surfaces, soft surfaces and textile composite floorings. This allows facility professionals to make informed decisions about product choices and associated costs. Going through the process can ensure that facility professionals maximize the dollars spent on their purchase.

When it comes to flooring, it’s important to know the costs beyond the initial material and installation — including maintenance time, tools and replacement considerations.

This article originally appeared in the issue of .

About the Author

Bob Bethel is the director of Business Development, Education, for J+J Flooring Group. J+J offers an online calculator, floorlifecost.com. Bob can be reached at [email protected] or 800/241-4586.

Featured

  • UTampa Breaks Ground on STEM Academic Facility

    The University of Tampa in Tampa, Fla., recently broke ground on one of its largest academic facilities ever, according to a news release. The Dickey Science Innovation Center will measure 153,000 square feet and has a scheduled completion date of fall 2028.

  • Academy of Classical Education Breaks Ground in Louisiana

    Charter Schools USA (CSUSA) recently announced the groundbreaking of a new public charter school in Covington, La., according to a news release. The Academy of Classical Education at Covington will enroll students in grades K–8 and is scheduled for completion in August 2026, just in time for the new school year.

  • Fargo, N.D., Starts Construction on Consolidated Elementary School

    Fargo Public Schools in Fargo, N.D., recently announced the beginning of construction on a new elementary school, according to a news release. The district partnered with ICON Architectural Group and Kraus-Anderson Construction on the new Horace Mann Elementary School.

  • Arizona District Breaks Ground on Community Training, Learning Center

    The Tolleson Union High School District (TUHSD) in Tolleson, Ariz., recently broke ground on a new Training & Learning Center (TLC) for both district professionals and the community at large, according to a news release. The 90,000-square-foot facility has an estimated completion date of spring 2027.