What costs should be considered for flooring?

A floor covering, especially for today’s active learning environments, must be durable, maintain its appearance and support the desired instructional-intended design of that space. When considering these factors — and knowing a flooring surface is typically the largest of any surface in a space — specifying the right flooring product is important to get the most for long-term use.

When budgets are tight, it can be tempting to select low-cost or inexpensive flooring. This approach might save money upfront for material and installation cost, but it can have consequences on the back end. Lower-cost flooring may require more maintenance over time, or it might need replacing sooner than expected, costing more money in the long run.

When selecting flooring for an educational environment, facility experts should consider not only the upfront costs, but also the expected total “lifecycle cost of ownership” for that product.

Calculating this cost does not need to be time-consuming. Some industry associations and manufacturers offer tools to help facility executives with this important task, including online calculators that enable users to compare lifecycle costs across various flooring types, including hard surfaces, soft surfaces and textile composite floorings. This allows facility professionals to make informed decisions about product choices and associated costs. Going through the process can ensure that facility professionals maximize the dollars spent on their purchase.

When it comes to flooring, it’s important to know the costs beyond the initial material and installation — including maintenance time, tools and replacement considerations.

This article originally appeared in the issue of .

About the Author

Bob Bethel is the director of Business Development, Education, for J+J Flooring Group. J+J offers an online calculator, floorlifecost.com. Bob can be reached at [email protected] or 800/241-4586.

Featured

  • Little Grand Market

    Designing for Belonging: Why Student Wellness Starts with Space

    From walkable site planning to flexible interiors, intentional design choices play a critical role in how students experience comfort, connection, and community.

  • El Paso District Breaks Ground on New Elementary School

    The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027.

  • blurry image capturing students navigating crowded hallways between classes

    How Human Behavior Data Is Reshaping Campus Facilities Management

    The ebb and flow of students, faculty, and administrators across a campus have a larger impact on maintenance, cleaning, and sustainability than many realize.

  • Ohio State University Opens 26-Story Hospital

    The Ohio State University Wexner Medical Center recently opened in Columbus, Ohio, standing 26 stories and covering 1.9 million square feet, according to a university news release. The project marks ten years of effort and is the university’s largest single-facility construction project ever.