Simplify Maintenance With Rubber Flooring

Maintaining floor coverings throughout educational facilities can be challenging. Floors in these buildings are subject to a variety of uses. Foot traffic is significant and opportunities for staining numerous. Rubber flooring offers a solution that simplifies maintenance, despite an array of performance requirements, heavy use and substantial staining. Here’s why.

Rubber flooring is a sustainable material made from natural and synthetic rubber. Its dense, homogeneous surface repels dirt while resisting staining. As a result, the floor stays clean longer and can be maintained with little more than water. The dense surface does not absorb water, chemicals and other liquid spills, which makes for easy cleanup while minimizing the potential for slips.

Rubber flooring never requires waxing, labor-intensive stripping or the application of sealants, saving valuable time and money.

Maintenance is far less intrusive, because occupants do not need to be moved from areas for extended periods of time while floors are cleaned and waxes are stripped, reapplied and allowed to dry. For the same reason, maintenance is not restricted to holiday and summer breaks, eliminating the cost of running the HVAC system to keep staff comfortable and meet the needs of stripping and waxing protocols.

The resiliency of rubber flooring makes it easier to move equipment and furniture across the floor. It also ensures the comfort of housekeeping staff, protecting against muscle fatigue and aching backs, legs and feet.

In addition to these maintenance benefits, rubber flooring offers a variety of performance features and the durability that make it an attractive long-term investment for institutions looking to save money and create safe, comfortable and attractive environments.

This article originally appeared in the issue of .

About the Author

Tasha Hughes is a marketing specialist, PR, for nora systems, Inc. (www.nora.com/us). She can be reached at [email protected] or 800-332/NORA.

Featured

  • New Arizona Fine Arts School Reaches Construction Milestone

    Construction of the new Hilltop School for the Arts and Theater in Litchfield Park, Ariz., recently hit a significant milestone, according to a news release. The Agua Fria High School District held a beam-signing ceremony to celebrate the building’s topping out, or the placement of its last structural beam.

  • Construction Begins on New University Research Vessel

    Boat-building company All American Marine recently announced that it has begun construction on a new catamaran research vessel for the University of Texas Marine Science Institute (UTMSI) in Port Aransas, Texas, according to a news release.

  • Texas District Breaks Ground on Second High School

    The Waller Independent School District in Waller, Texas, recently held a groundbreaking ceremony for what will become its second high school, according to a news release.

  • Tennessee Middle School Completes Health, Life Safety Renovations

    The Giles County Board of Education in Pulaski, Tenn., recently announced that a series of renovation projects has been completed at Bridgeforth Middle School, according to a news release. The district partnered with Wold Architects & Engineers and Brindley Construction to modernize building systems at one of the district’s oldest schools.