Simplify Maintenance With Rubber Flooring

Maintaining floor coverings throughout educational facilities can be challenging. Floors in these buildings are subject to a variety of uses. Foot traffic is significant and opportunities for staining numerous. Rubber flooring offers a solution that simplifies maintenance, despite an array of performance requirements, heavy use and substantial staining. Here’s why.

Rubber flooring is a sustainable material made from natural and synthetic rubber. Its dense, homogeneous surface repels dirt while resisting staining. As a result, the floor stays clean longer and can be maintained with little more than water. The dense surface does not absorb water, chemicals and other liquid spills, which makes for easy cleanup while minimizing the potential for slips.

Rubber flooring never requires waxing, labor-intensive stripping or the application of sealants, saving valuable time and money.

Maintenance is far less intrusive, because occupants do not need to be moved from areas for extended periods of time while floors are cleaned and waxes are stripped, reapplied and allowed to dry. For the same reason, maintenance is not restricted to holiday and summer breaks, eliminating the cost of running the HVAC system to keep staff comfortable and meet the needs of stripping and waxing protocols.

The resiliency of rubber flooring makes it easier to move equipment and furniture across the floor. It also ensures the comfort of housekeeping staff, protecting against muscle fatigue and aching backs, legs and feet.

In addition to these maintenance benefits, rubber flooring offers a variety of performance features and the durability that make it an attractive long-term investment for institutions looking to save money and create safe, comfortable and attractive environments.

This article originally appeared in the issue of .

About the Author

Tasha Hughes is a marketing specialist, PR, for nora systems, Inc. (www.nora.com/us). She can be reached at [email protected] or 800-332/NORA.

Featured

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

  • California High School Starts Construction on New CTE Building

    Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking.

  • modern college building with circuit and brain motifs

    Anthropic Introduces Claude for Education

    Anthropic has launched a version of its Claude AI assistant tailored for higher education institutions. Claude for Education "gives academic institutions secure, reliable AI access for their entire community," the company said, to enable colleges and universities to develop and implement AI-enabled approaches across teaching, learning, and administration.

Digital Edition