NSF 342 Included in LEED v4 Pilot Credit

Washington, D.C. — The U.S. Green Building Council (USGBC) has cited wallcoverings certified to the NSF/ANSI 342 Sustainability Standard for Wallcovering as eligible for credits under LEED® v4. Certified products qualify for a possible one point under the Pilot Credit entitled Certified Multi-attribute Products and Materials. The intent of the Pilot Credit is “to encourage the use of products and materials for which life-cycle information is available and that have environmentally, economically, and socially preferable life-cycle impacts,” according to USGBC.

Wallcoverings covered by NSF/ANSI 342 include textiles, vinyl, vinyl coated, alternative polymer, alternative polymer coated, paper and natural fiber products. The standard evaluates criteria across the product life cycle, from raw material extraction through manufacturing, distribution, use, and end-of-life management. Unique to this standard is the requirement that both manufacturer and distributor qualify in order for the product to carry the certification.

“We are pleased that USGBC has expanded LEED to include NSF/ANSI 342 as an accepted certification program,” said Sean Samet, Executive Director for the Wallcoverings Association. “The wallcoverings industry is continually working to reduce the environmental impact of its products, and is proud of the industry-wide effort that developed this multi-attribute standard. The third-party certification provides accountability and transparency to all aspects of the product’s manufacture and distribution.”

For more information, contact the WA at (312) 321-5166 or visit wallcoverings.org.

Featured

  • Greenheck Receives Sourcewell Cooperative Contract

    Air movement, control, conditioning, and distribution equipment solutions provider Greenheck recently announced that it has been awarded a Sourcewell cooperative purchasing contract, according to a news release. The HVAC Systems contract will allow Greenheck the opportunity to expand opportunities in government procurement and other public agencies in North America.

  • Agualta STEAM Engine

    Outdoor Learning Spaces and Biophilic Design Create Community in East Los Angeles

    Griffith STEAM Magnet Middle School's Agualta STEAM Engine blends education, community, and nature through its adaptable design.

  • California High School Starts Construction on New CTE Building

    Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

Digital Edition