What Causes a Flat Roof to Leak?

Many campus buildings feature flat roofing. Because there is no pitch, these systems rely heavily on a combination of product quality, membranes and initial installation. Some reasons your flat roofs may develop leaks include:

Clogged Drainage
A flat roof relies on a drainage system to remove rain water. If the drainage system is clogged, water will pond on your roof. Ponding water eventually leads to excess strain on the roof, and inevitably the water will start to seep inside.

Damage to the Perimeter Flashing
Flashing is installed on the edges of the rooftop as well as the interior parapets to protect the roof’s membrane. Moisture and water can seep underneath this flashing and into the building if it is not installed correctly, or becomes damaged.

Open Penetrations
Penetrations are common on rooftops, including as drains and pipes. When these are not installed properly, they leave a roof prone to leaks. They should be kept watertight with flashing, wraps, rain collars and pitch pans.

Damage to the Membrane
When a roof’s membrane becomes damaged, it allows water to enter through the opening. Membranes can become damaged for a variety of reasons. Sometimes it is just a matter of age.

The Age of Your Roof
Flat roofing in areas that experience hot summers or harsh winters will eventually start to fail due to age. Most systems deteriorate at about 15 to 20 years post-installation.

This article originally appeared in the issue of .

Featured

  • LAN, Inc. Opens Office in College Station, Texas

    Lockwood, Andrews & Newnam, Inc. (LAN) recently announced the opening of a new office in College Station, Texas, to support its regional client base, according to a news release. The organization provides engineering, design, and program management services for water, wastewater, transportation, stormwater, and education clients in the Brazos Valley.

  • DFW-Area District Opens New Replacement Middle School

    The Eagle Mountain-Saginaw Independent School District near Fort Worth, Texas, recently held a ribbon-cutting ceremony for a new replacement middle school campus, according to a news release. The new facility for Wayside Middle School, originally established in 1964, was built on the site of the former district administration building and funded through Bond Proposition A in 2023.

  • Doerr School of Sustainability Accelerator

    From Concrete Warehouse to Innovation Hub: Accelerating Sustainability at Stanford

    The transformation of a once windowless, concrete publishing warehouse into a sun-drenched center for global innovation began with a single, fundamental challenge: how to turn an industrial storage shell into a space built for human connection.

  • Spaces4Learning Launches 2026 Education Design Showcase Awards

    Spaces4Learning has opened submissions for the 2026 Education Design Showcase! The awards program launched in 1999 with the goal of celebrating innovative, practical solutions in the planning, design, and construction of K–12 and higher-education facilities. EDS recognizes new developments that help achieve optimal learning environments, as well as the architecture firms that brought the ideas to life.