University of Minnesota, Mankato: The Connection

University of Minnesota, Mankato

PHOTOS © LEO A DALY

The Connection at the University of Minnesota, Mankato (MSUM) solves a delicate campus planning challenge with two solutions in one — an underground pedestrian link crossing the campus mall, and an outdoor amphitheater/classroom that enhances student life.

Considered the heart of the campus, MSUM’s mall bustles with activity throughout the year. Connecting the student union, library and several classroom buildings, its robust program of sculptures and public spaces provide a gathering place for students that is welcoming, functional and artistic.

The university wanted to provide an ADA-compliant indoor passage for students crossing the mall from the library to the student union during the brutal Minnesota winters without introducing a disruptive element to the mall’s open, energetic design.

LEO A DALY responded by designing a pedestrian link that is integrated into the existing campus and becomes a key element to the campus mall: a “tunnel” with one side exposed to an amphitheater cut into the existing grade. In cold weather, a 33-foot expanse of curtain wall fills the indoor passageway with natural light. In nice weather, that same curtain wall plays backdrop to outdoor student performances, classes and movie nights.

Within the Connection, the east wall slopes back at 35 degrees from vertical. It is composed of shotcrete on top of excavated soil, waterproofing and a 3-inch-deep steel ribbed roof deck backfilled with concrete. This angled wall provides an efficient and compact structure for earth retainage, and made possible smaller and therefore less expensive footings as well as minimal disruption to the mall’s existing plantings and walking surfaces. In addition to being a structural element in the wall design, the roof decking served as a framework for the cast-in-place concrete (a project requirement). This minimized the need for supports and rented formwork and enabled construction to meet an aggressive schedule.

This article originally appeared in the issue of .

Featured

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

  • California High School Starts Construction on New CTE Building

    Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking.

  • modern college building with circuit and brain motifs

    Anthropic Introduces Claude for Education

    Anthropic has launched a version of its Claude AI assistant tailored for higher education institutions. Claude for Education "gives academic institutions secure, reliable AI access for their entire community," the company said, to enable colleges and universities to develop and implement AI-enabled approaches across teaching, learning, and administration.

Digital Edition