Doing More with Less: 5 Behaviors for Success

Although it may feel like you’re stuck in a cycle of reactive work orders and last minute tasks, there is a way to not only begin prioritizing your work but also take control of budgeting so your resources are spent where they make the most impact. Through our work with some of the most effective and innovative facilities teams, we’ve created best practices that will help you increase your team’s efficiency with clear data on your current workflow management, state of your assets, and your overall effectiveness as a team.

By arming yourself with this data, you can present budget information for upcoming fiscal years with accurate and detailed information. You can justify your budgets through your unique insight into what your department truly needs to be successful. It may sound like a large task to take on, but it’s doable (and effective) with just five steps — or as we like to call it, the APPEM framework: Assess, Prioritize, Plan, Execute and Maintain.

1. Assess
The first stage of the APPEM model is to assess what you currently have. This includes everything from AC units to replacement parts well as your current method of data collection (if you collect data at all — if you don’t, you should!). Of course, this is where a Facility Condition Assessment (FCA) comes in. Having the detailed data from this assessment offers unique insights into the state of your facilities, and coupled with your historical facilities data, it’s a valuable piece to move forward onto Step 2.

2. Prioritize
A typical workday can feel like you’re running around putting out fires and doing last minute tasks if you don’t properly prioritize. Plus, it can leave you open to unexpected failures and take valuable time away from planning for preventive tasks and bigger projects. This step involves looking at the most important tasks on your plate from your Assessment and taking into account longer-term projects. For example: Is there a piece of equipment that is going to need be replaced immediately? Or can it simply be taken care of with routine maintenance to make room for other, more pressing tasks?

3. Plan
Through proper Assessment (Step 1) and Prioritizing (Step 2), you’ve been able to identify the tasks that take up your day and order them by level of importance. At this stage, you can make a plan to both focus on those high priority projects while figuring out a game plan to minimize the tasks that distract from your goals. Having a plan of action is crucial and it can protect your time from getting taken up by last minute requests.

4. Execute
At this stage, you’ve prioritized and your plans are set. All that’s left to do is execute by solving the most important problems at hand first. At this step in the process, you may experience growing pains, and it’s important to take them as learning opportunities to improve the process even more.

5. Maintain
In order to maintain the process as you intended, you need to make sure that you’re still balancing reactive and proactive work with your projects. This includes using the data that you’ve accumulated to make better decisions for the future that will allow you to maintain your facilities while continuing to minimize tasks that take away from big projects.

Taking Control of Your Resources

Assessing, Prioritizing, Planning, Executing and Maintaining (our APPEM model of success) should be a cyclical process that you can return to. These steps provide you with standards for the data you collect so that you can create reports that prove the worth of your department, highlight cost savings opportunities and eliminate the tasks that undermine your productivity. Plus, you’ll create a feedback loop that helps give visibility to management and clear goals to your personnel. Of course, any best practices you adopt should also work hand in hand with your maintenance solution so you can continuously improve and record.

This article originally appeared in the issue of .

Featured

  • Beeville ISD Starts Construction on New Elementary School

    The Beeville Independent School District near Corpus Christi, Texas, recently began a construction project that will consolidate two existing, aging schools into a new elementary school, according to a news release. The district is partnering with Pfluger Architects and Spawglass General Contractors for the design and construction, respectively, of the new facility.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

  • Abstract colorful arrows in front of a contemporary university building

    Spaces4Learning 2025 Trends in Higher Education

    With 2025 well underway, it’s time to take a look at some broader trends submitted by you, our Spaces4Learning readership. We asked for your thoughts on topics like classroom design, health & safety, materials & construction, and technology in both K–12 and higher-education environments. Below is a roundup of 2025 trends in higher education from the experts in the trenches.

  • University of Kentucky Integrates New Cleaning Technology

    The University of Kentucky in Lexington, Ky., recently installed a new cleaning system designed to improve cooling efficiency on campus, according to a news release. The Facilities Management’s Utilities and Energy Management Unit installed new chiller tubes into two of the chillers at the university’s Central Utility Plant.

Digital Edition