Putnam High School Renovation Complete

Putnam High SchoolTorrington, Conn. –  Putnam High School in Putnam, Conn., recently completed a $36.6-million, 98,000-square-foot, renovate-as-new project that began in the fall of 2014.  The scope of the project included replacing windows, renovating science labs, expanding the gymnasium, transforming the existing library into a multi-media center and upgrading the mechanical infrastructure of the 60-year-old building.

“During the course of this project we performed a comprehensive renovation that upgraded the school’s facilities to that of a modern educational environment.  In the areas that were touched by the renovation we removed all of the structure down to the outer shell of the building.  Then we reconstructed the facility with all new components” said Ken Biega, assistant vice president of O&G Industries.  “We will also address challenges such as the lack of natural light, bring outdated systems up to code, incorporate energy efficient design features and expand areas such as the gymnasium that no longer meet the school’s needs.”

The project team included construction manager O&G Industries of Torrington, Connecticut and project architect Drummey Rosane Anderson (DRA Architects) of South Windsor, Connecticut.

About O&G Industries, Inc.
O&G is Connecticut’s largest privately-held construction company, one of the country’s Top 400 Contractors and a Top 100 Green Building Contractor.  Visit www.ogind.com.

About Drummey Rosane Anderson (DRA Architects)
DRA is a thriving firm of 30 architects, planners, interior designers and construction administrators.  We specialize in educational, municipal, recreational, and institutional design. Visit www.draarchitects.com.

Featured

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • 144-Year-Old High-School Campus Debuts New Academic Facility

    San Diego High School (SDHS) in San Diego, Calif., recently held a ribbon-cutting ceremony for a new student services and classroom building; the project is part of a larger SDHS Whole Site Modernization project that began in 2022.

  • Photo credit: Elkus Manfredi Architects

    University of Virginia Selects Design-Build Team for New Residential Complex

    The University of Virginia in Charlottesville, Va., recently announced that it has selected a design-build team for a new upper-class residential development on campus, according to a news release. Capstone Development Partners—in partnership with Elkus Manfredi Architects and the Hoar Construction/Hourigan construction team—will move forward with the three-building, 310,000-square-foot housing facility.

  • How a Portable Sink Helped an Art Classroom Run More Smoothly

    Classroom design decisions can have outsized effects on instructional time and safety at schools juggling mismatched infrastructure, strict budgets, and crowded schedules — particularly in the arts. Between spilled paint and dirty brushes, art classes run smoother with a sink in the studio. But many schools don’t have a sink in every art classroom.