Putnam High School Renovation Complete

Putnam High SchoolTorrington, Conn. –  Putnam High School in Putnam, Conn., recently completed a $36.6-million, 98,000-square-foot, renovate-as-new project that began in the fall of 2014.  The scope of the project included replacing windows, renovating science labs, expanding the gymnasium, transforming the existing library into a multi-media center and upgrading the mechanical infrastructure of the 60-year-old building.

“During the course of this project we performed a comprehensive renovation that upgraded the school’s facilities to that of a modern educational environment.  In the areas that were touched by the renovation we removed all of the structure down to the outer shell of the building.  Then we reconstructed the facility with all new components” said Ken Biega, assistant vice president of O&G Industries.  “We will also address challenges such as the lack of natural light, bring outdated systems up to code, incorporate energy efficient design features and expand areas such as the gymnasium that no longer meet the school’s needs.”

The project team included construction manager O&G Industries of Torrington, Connecticut and project architect Drummey Rosane Anderson (DRA Architects) of South Windsor, Connecticut.

About O&G Industries, Inc.
O&G is Connecticut’s largest privately-held construction company, one of the country’s Top 400 Contractors and a Top 100 Green Building Contractor.  Visit www.ogind.com.

About Drummey Rosane Anderson (DRA Architects)
DRA is a thriving firm of 30 architects, planners, interior designers and construction administrators.  We specialize in educational, municipal, recreational, and institutional design. Visit www.draarchitects.com.

Featured

  • Minnesota Middle School Finishes $23.5M Addition and Modernization

    Highland Park Middle School in St. Paul, Minn., recently announced the completion of a $23.5-million addition and remodel project, according to a news release. Saint Paul Public Schools partnered with ATS&R Planners, Architects & Engineers for its design and Kraus-Anderson for its construction.

  • New Arizona Fine Arts School Reaches Construction Milestone

    Construction of the new Hilltop School for the Arts and Theater in Litchfield Park, Ariz., recently hit a significant milestone, according to a news release. The Agua Fria High School District held a beam-signing ceremony to celebrate the building’s topping out, or the placement of its last structural beam.

  • Hawaii Elementary School Breaks Ground on New Classroom Building

    Kealakehe Elementary School in Kailua, Hawaii, recently began construction on a new, $16-million classroom building for its campus, according to a news release. The 13,000-square-foot building will stand two stories and connect the existing upper and lower campuses.

  • LSU Breaks Ground on $200M Residential Project

    Louisiana State University in Baton Rouge, La., recently broke ground on a new residential complex, according to university news. The South Quad residential project will consist of two buildings and add a total of 1,266 beds for freshmen students. The development comes with a price tag of $200 million, and it’s scheduled to open to students in fall 2027.