Putnam High School Renovation Complete

Putnam High SchoolTorrington, Conn. –  Putnam High School in Putnam, Conn., recently completed a $36.6-million, 98,000-square-foot, renovate-as-new project that began in the fall of 2014.  The scope of the project included replacing windows, renovating science labs, expanding the gymnasium, transforming the existing library into a multi-media center and upgrading the mechanical infrastructure of the 60-year-old building.

“During the course of this project we performed a comprehensive renovation that upgraded the school’s facilities to that of a modern educational environment.  In the areas that were touched by the renovation we removed all of the structure down to the outer shell of the building.  Then we reconstructed the facility with all new components” said Ken Biega, assistant vice president of O&G Industries.  “We will also address challenges such as the lack of natural light, bring outdated systems up to code, incorporate energy efficient design features and expand areas such as the gymnasium that no longer meet the school’s needs.”

The project team included construction manager O&G Industries of Torrington, Connecticut and project architect Drummey Rosane Anderson (DRA Architects) of South Windsor, Connecticut.

About O&G Industries, Inc.
O&G is Connecticut’s largest privately-held construction company, one of the country’s Top 400 Contractors and a Top 100 Green Building Contractor.  Visit www.ogind.com.

About Drummey Rosane Anderson (DRA Architects)
DRA is a thriving firm of 30 architects, planners, interior designers and construction administrators.  We specialize in educational, municipal, recreational, and institutional design. Visit www.draarchitects.com.

Featured

  • Spaces4Learning Launches 2025 New Product Awards

    Spaces4Learning is now accepting entries for the 2025 New Product Awards! The program’s goal is to honor the outstanding product development achievements of manufacturers and suppliers whose products and services are particularly noteworthy in helping to improve K–12 and Higher Education learning environments.

  • University of Kentucky Integrates New Cleaning Technology

    The University of Kentucky in Lexington, Ky., recently installed a new cleaning system designed to improve cooling efficiency on campus, according to a news release. The Facilities Management’s Utilities and Energy Management Unit installed new chiller tubes into two of the chillers at the university’s Central Utility Plant.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • Gretna East High School

    Gretna East High School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Gretna East High School has been recognized with an EDS 2025 Project of Distinction award in the category of New Construction.

Digital Edition