America’s First CLT Academic Building Completed at UMass Amherst

UMass AmherstThe Design Building at the University of Massachusetts Amherst, the first Cross Laminated Timber (CLT) academic building in the U.S. and the largest installation of wood concrete composites in North America, was recently completed by Leers Weinzapfel Associates. The $52 million, 87,500-square-foot project, made possible through supplemental funding from the Massachusetts State Legislature, is a dynamic space of exchange, collaboration, and experiment. Uniting the university’s departments of Architecture, Landscape Architecture and Regional Planning, and the Building and Construction Technology program under one roof for the first time, the structure itself is a teaching tool for prescient sustainable design.

The building is organized around a skylit central commons that brings students together for lectures, exhibits, presentations and informal gatherings. Studios, maker spaces and classrooms surround the central space that opens onto the street as a showcase for the design disciplines. The commons is capped by a green roof that comprises an outdoor learning environment and experimental space for the landscape department.

A demonstration of the construction process itself, columns and beams of glue-laminated wood, a floor of composite, exposed cross laminated timber plank and cast in place concrete and the lobby’s “zipper truss” (developed in consultation with Equilibrium Consulting) all exemplify innovative timber engineering.

The building’s highly efficient envelope of copper-colored anodized aluminum panels and vertical windows suggests the colors and patterns of the region’s forests and trees. Surrounding landscaping by Stephen Stimpson Associates makes extensive use of native plants and paving materials. Dedicated mechanical equipment is zoned for optimal efficiency, and extensive glazing and skylights provide maximum daylight to the building’s interior, reducing the need for artificial lighting. Stormwater management directs roof runoff to a “spring source” at the top of the site, filtering the water through bio-swales and timber dams to the site’s lower end and back to the Connecticut River. Suffolk was construction manager for the project, which is targeting LEED Gold certification.

“We imagined this building as a teaching tool for the design disciplines,” says Leers Weinzapfel Principal Andrea Leers, FAIA. “I know from my own teaching experience that there’s nothing more potent than being able to talk with students about the space around you — in this case, the building’s collaborative configuration, innovative structure, considered material and detailing choices, environmentally-driven site, and synergistic landscape concepts that define the project.

“The Design Building is an extraordinary mixing bowl for the disciplines that focus on the design of the built environment,” says Steve Schreiber, FAIA, professor and chair, UMass Amherst Department of Architecture. “Students and faculty alike now productively collaborate in the beautiful light-filled common areas, studios, shops, and seminar rooms. Positioned in the center of campus, the building is a critical link in the university’s arts necklace.”

Featured

  • University of West Florida Opens New Laboratory Facility

    The University of West Florida recently announced that renovation work is complete on a new lab building for its campus in Pensacola, Fla., according to university news. Building 80 will serve as the home to the university’s civil engineering program and the Tyler Chase Norwood Construction Management Program.

  • ALAS Announces 2025–26 Award Winners

    The Association of Latino Administrators and Superintendents (ALAS) recently announced the winners of its 2025–26 leadership awards, according to a news release. Winners will be recognized at the ALAS 22nd National Summit on Education, scheduled for Oct. 15–17 in Chicago, Ill.

  • University of Kansas Opens $400M Football Stadium Reconstruction

    The University of Kansas in Lawrence, Kan., recently announced that the $400-million reconstruction of David Booth Kansas Memorial Stadium is complete in time for the 2025 football season, according to a news release. The university partnered with Turner Construction Company on the project.

  • ClassVR headsets

    Avantis Education Revamps Hardware for ClassVR Solution

    Avantis Education recently announced the launch of two new headsets for its flagship educational VR/AR solution, ClassVR. According to a news release, the Xcelerate and Xplorer headsets expand the company’s offerings into higher education while continuing to meet the evolving needs of K–12 users.

Digital Edition