KU Medical Center Addresses State's Shortage of Healthcare Professionals

KU HospitalThe University of Kansas Medical Center (KU Medical Center) — home to Kansas’ only school of medicine — celebrated the recent opening of the Health Education Building (HEB) to address the state’s critical shortage of healthcare professionals in underserved communities. The new, four-story, 171,000-square-foot building designed by CO Architects (programming and design architect) and Helix Architecture + Design (executive architect) significantly enhances the medical campus’ existing facilities, curriculum, and classrooms with high-tech simulation environments and flexible learning studios.

"The advanced teaching technology at KU Medical Center’s Health Education Building supports new models of learning to attract and educate a greater number of doctors, nurses, and healthcare professionals," says Paul Zajfen, FAIA, RIBA, Design Principal at Los Angeles-based CO Architects. "Design considerations were made to create a first-rate educational building that is flexible enough to accommodate a 25 percent class size increase over its current enrollment."

Located on the northeast corner of West 39th Avenue and Rainbow Boulevard, the new HEB creates an iconic presence artfully balanced by a transparent, four-story "lantern" box design. Glass allows public and student areas to have access to natural daylight and exterior views. The building blends traditional and emerging educational spaces that support active, team-based learning — from large-scale teaching studios to state-of-the-art clinical skills and simulation laboratories. Two 225-person interactive studios can be combined by an operable partition to create one column-free 11,000-square-foot event space. These specialized programmatic elements "float" within the glass container to put the heart of the building, the core of its curriculum, on display to the public.

HEB sits at the center of existing clinical, research and educational buildings on the Kansas City campus. The new building will serve as the primary teaching facility to support inter-professional education for three schools (University of Kansas School of Medicine, School of Nursing, and School of Health Professions) and connects its users with a 250-foot-long glass-enclosed "building" bridge passing directly through HEB’s center and spanning over the adjacent street. The bridge links the campus into an energized, interdisciplinary loop to become the intersection of campus life with 6,000 square feet of lounge, meeting, and student activity space.

The overall design consciously incorporates energy-efficient systems, recycled and regional materials, and passive energy strategies. The design improves current site conditions by transforming an on-grade parking lot into a 22,000-square-foot green courtyard and a 17,000-square-foot vegetated roof with access. These garden spaces will welcome and encourage outdoor activity around the building. An irrigation system utilizes condensate water from the building’s mechanical system.

In addition to Zajfen, the CO Architects design team includes: Scott Kelsey, FAIA, managing principal; Jonathan Kanda, FAIA, LEED-AP BD+C, principal/project manager; Tanner Clapham, AIA, associate/project designer; Chao Chen, architect; and Michael Ly, designer.

Featured

  • GeoCam and UCLA: Modernizing Campus Accessibility Mapping

    In early 2025, UCLA partnered with GeoCam to capture and modernize its pedestrian infrastructure data. The goal was ambitious but clear: to produce a high-accuracy, imagery-backed digital map of every sidewalk, pathway, ramp, and ADA-related feature on UCLA’s 419-acre campus.

  • Classical building columns display digital data streams

    The Campus Nervous System: Why Facilities Risk Is Now a Leadership Issue in Higher Education

    Facility performance now intersects with safety, compliance, on-campus experience, institutional reputation, and financial resilience. That places it firmly on the leadership agenda.

  • Washington State District Breaks Ground on New Elementary School

    Cheney School District No. 360 in Spokane County, Wash., recently announced that construction has begun on a new elementary school, according to local news. The district held a groundbreaking ceremony on May 18 in Airway Heights for the yet-to-be-named school, which is scheduled to open in fall 2027.

  • Year-Round Schools Require Year-Round Indoor Air Quality Planning

    While many schools are out for the summer, year-round schools follow a more “balanced” schedule with shorter, more frequent breaks spaced throughout the school year. Even though this offers educational benefits, these facilities have less downtime for building maintenance. This can become an issue when facilities managers overlook the importance of routine HVAC maintenance and air duct cleaning services.