Growing District Breaks Ground for Junior High Addition/Expansion

Aptakisic-Tripp School District 102 (D102), Wight & Company, and IHC Construction joined students, parents, teachers, administrators and local officials in Buffalo Grove, Ill. on October 9 to celebrate the groundbreaking of an expanded junior high school building for D102. The renovation will add much needed classroom space for the growing district. An addition of approximately 14,000 square feet will expand fine arts facilities, adding new rooms for band, orchestra, art and multi-purpose use. In addition, the cafeteria will be enlarged and a maker space will be created. The existing parking lot will be reconfigured to improve overall traffic flow as part of the construction project.

Lake County New School

D102 officials chose Wight & Company, a firm that is well known for its designs of PK-12 schools throughout the Chicago suburbs, as design architect and architect of record and asked the firm to rethink the existing building. Wight & Company is a longtime partner of D102, having worked with the district previously on renovations to the library at Aptakisic Junior High School.

"The team from Wight & Company has been tremendous to work with. They've truly partnered with us to create student-centered spaces, always putting students at the forefront of the design process. They've shown an incredible willingness to listen and take into consideration multiple perspectives. We are so grateful for their patience, dedication and talent - and can't wait for the project to come to fruition!" says D102 Superintendent Lori Wilcox.

"The newly designed classroom spaces at Aptakisic Junior High School will create an open, flexible and positive learning environment for today, tomorrow and the future," comments Amy Fuller, project manager for Wight & Company. Design elements of the expanded junior high will include:

  • Bringing natural daylight, which is known to enhance student performance and well-being, into the heart of the school
  • Adding an outdoor courtyard
  • Expanding gathering spaces to foster interaction and collaboration

The renovation and expansion of the 1950s-era junior high school building is part of a larger multi-year plan to adapt four individual school buildings to better accommodate the needs of a district with a growing student population, as well as to better serve the evolving educational needs of 21st century learners. Overall district enrollment grew from 2,000 to 2,300 between 2011 and 2017. More growth is anticipated due to new residential construction underway in the communities served by D102.

Featured

  • Construction Begins on 100+ Acre K–12 Campus Designed for Lakota Culture

    The Cheyenne River Sioux Tribe (CRST) and the Cheyenne-Eagle Butte School District in Eagle Butte, S.D., recently broke ground on a new K–12 campus that will cover more than 100 acres and serve students and families across 1,600 square miles, according to a news release.

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • ed tech conference calendar

    Upcoming Awards, Events & Webinars

  • Longwood University Hits Construction Milestone on New Music Education Facility

    Longwood University in Farmville, Va., recently celebrated the topping out of its new music education and performance facility, according to a news release. The university partnered with development and construction firm Skanska on the 63,800-square-foot facility, which began construction in August 2025 and has an estimated completion date of fall 2028.