How can we achieve ADA compliance?

When looking at meeting ADA requirements most only think of wheelchair accessibility. This is only part of the equation. We must also make accommodations for those with vision, hearing or speech disabilities. Here are five items to consider for ADA compliance when creating or improving your learning spaces.

1. Ensure proper spacing between walls and fixed furniture; typically, 60 inches in most cases.

2. Consider tables or instructors’ stations that can provide both the proper height and knee clearance: 30 inches wide by 19 inches deep by 27 inches high. If looking at adjustable height, consider electric lift systems rather than crank or pneumatic as they can be controlled with no effort from the user.

3. Review areas of reach on walls and fixtures.
a) Height reach restriction: 15 inches (minimum) and 48 inches (maximum) from floor.
b) Unobstructed forward reach: 20-25 inches deep (maximum, height restriction of 48 inches).
c) Obstructed side and forward reach: 10-24 inches deep (maximum, obstruction 34 inches maximum).

4. Items protruding from a wall that are between 27 inches to 80 inches high can be no more than 4 inches deep from the wall. This includes monitors and screens. Items below 27 inches can be identified with a cane.

5. Ensure that you have assistive listening devices, and proper line of sight for visual aids. Also check whether the technology you are using can help support those with hearing disabilities.

Achieving ADA compliance can add benefits such as improved ergonomics, along with providing the optimal learning environment for students and instructors. It may seem like a daunting task but there are many resources available. We always recommend reviewing ADA guidelines regularly to check for updates or changes.

This article originally appeared in the issue of .

About the Author

Ben Jones is the national sales manager for Spectrum Industries, Inc. (www.spectrumfurniture.com). He can be reached at [email protected] or 407/242-6256.

Featured

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.

  • Minnesota District Starts Construction on Early Childhood Learning Center

    Sauk Rapids-Rice Public Schools in Sauk Rapids, Minn., recently announced that construction has begun on a new early childhood learning center and a new outdoor activities complex, according to a news release.

  • Rowan University, HPE Partner on New Learning Initiative

    Rowan University in Glassboro, N.J., recently announced that it has expanded its partnership with enterprise technology provider HPE to improve research capabilities and hands-on learning opportunities, according to a news release.

  • Cal Poly Humboldt Starts Construction on Healthcare Education Hub

    California State Polytechnic University, Humboldt in Arcata, Calif., recently announced that work has begun on a renovation project that will turn the Stewart Building into a new Healthcare Education Hub, according to a news release. The university is partnering with Sundt Construction Inc. for construction services.