How can we achieve ADA compliance?

When looking at meeting ADA requirements most only think of wheelchair accessibility. This is only part of the equation. We must also make accommodations for those with vision, hearing or speech disabilities. Here are five items to consider for ADA compliance when creating or improving your learning spaces.

1. Ensure proper spacing between walls and fixed furniture; typically, 60 inches in most cases.

2. Consider tables or instructors’ stations that can provide both the proper height and knee clearance: 30 inches wide by 19 inches deep by 27 inches high. If looking at adjustable height, consider electric lift systems rather than crank or pneumatic as they can be controlled with no effort from the user.

3. Review areas of reach on walls and fixtures.
a) Height reach restriction: 15 inches (minimum) and 48 inches (maximum) from floor.
b) Unobstructed forward reach: 20-25 inches deep (maximum, height restriction of 48 inches).
c) Obstructed side and forward reach: 10-24 inches deep (maximum, obstruction 34 inches maximum).

4. Items protruding from a wall that are between 27 inches to 80 inches high can be no more than 4 inches deep from the wall. This includes monitors and screens. Items below 27 inches can be identified with a cane.

5. Ensure that you have assistive listening devices, and proper line of sight for visual aids. Also check whether the technology you are using can help support those with hearing disabilities.

Achieving ADA compliance can add benefits such as improved ergonomics, along with providing the optimal learning environment for students and instructors. It may seem like a daunting task but there are many resources available. We always recommend reviewing ADA guidelines regularly to check for updates or changes.

This article originally appeared in the issue of .

About the Author

Ben Jones is the national sales manager for Spectrum Industries, Inc. (www.spectrumfurniture.com). He can be reached at [email protected] or 407/242-6256.

Featured

  • Northeastern University Breaks Ground on New Housing Community

    Northeastern University recently announced the groundbreaking of a new student housing community on its campus in Boston, Mass., according to a news release. The university is partnering with American Campus Communities (ACC) for development of the project, which will have the capacity for 1,200 students and has a scheduled completion date of fall 2028.

  • golden trophies with falling confetti

    Spaces4Learning Launches 2026 New Product Awards

    Spaces4Learning is happy to announce that we’re now accepting entries for the 2026 New Product Awards! The awards program recognizes the outstanding product development achievements of manufacturers and suppliers whose products or services are considered particularly noteworthy.

  • Abstract tech network data connections with orange, blue glowing dots, lines

    3 Trends for Higher Education to Stay Ahead of in 2026

    As universities enter the new year, the question is no longer whether digital transformation is necessary, but how quickly institutions can convert technological potential into strategic advantage.

  • New Arizona Fine Arts School Reaches Construction Milestone

    Construction of the new Hilltop School for the Arts and Theater in Litchfield Park, Ariz., recently hit a significant milestone, according to a news release. The Agua Fria High School District held a beam-signing ceremony to celebrate the building’s topping out, or the placement of its last structural beam.