California School Unveils Renovated Campus

Inglewood Charter MiddleOn Saturday, November 4, Environmental Charter Middle School-Inglewood’s (ECMS-I) hosted their second annual Harvest Festival where they officially revealed their newly renovated campus, including the first-ever double-story modular construction using shipping containers in California used to build their classrooms. These containers came from the Port of Long Beach, where there are 750,000 retired shipping containers waiting to be repurposed.

Each standard 1280 square foot classroom diverts 22-tons of waste from local landfills reducing waste and minimizing the impact on natural resources.

The students led campus tours, harvested vegetables and California native plants, showed off their compost process, new dry creek bed and even put on a lunch featuring a kale salad from their campus garden.

The day also welcomed councilman Ralph Franklin from the City of Inglewood along with Los Angeles County Office of Education Board President Alex Johnson and several community partners who participated in the ribbon cutting ceremony.

Featured

  • Embry-Riddle Completes Construction on Research, Lab Facility

    Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced the end of construction on a new research and lab facility on campus. The Center for Aerospace Engineering II (CAT II) will support aerospace research and technology development and broke ground last summer.

  • S4L Announces 2026 Education Design Showcase Winners

    Spaces4Learning is thrilled to announce the winners of the 2026 Education Design Showcase! Now in its 27th year, the annual awards program honors innovative solutions in planning, design, architecture, and construction across K–12 and higher education.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.

  • Surging Demand for Student Housing Fuels Major Campus Investment Opportunities

    University leaders throughout the U.S. are accelerating plans to modernize and expand student housing as enrollment stabilizes and demand for on-campus living rebounds. Recent data from the National Center for Education Statistics indicates that total postsecondary enrollment is projected to grow through the end of the decade, with undergraduate enrollment alone expected to increase by more than 8 percent by 2030.