Keeping Entrances Clean and Safe

Keeping your buildings clean and safe can be a challenge; utilizing a functional entrance flooring product at your entrances can make all the difference. This durable product is designed to protect entrances throughout a building, is located where building users frequently enter and exit, and is made from materials like aluminum or stainless steel.

Entrance flooring is designed to maintain a clean, safe entryway. As foot traffic enters the building, debris fall between the rails into the recessed area below. Trapping debris maintains surface traction and reduces slip/fall risks, especially in soggy conditions. To clean and maintain, facility crews simply roll back or lift the system to vacuum debris from the recessed area. This shortens cleaning time and creates a safer walkway. Because entrance flooring can either be recessed or surface-mounted, there is less risk for the product to dislodge and pose an additional threat.

An educational facility can encounter thousands of students and faculty each day. It could also see heavy machinery like scissor lifts, dollies, or vending machines. It is important to select entrance flooring that is proven to withstand heavy rolling loads and continual foot traffic. Many manufacturers have testing criteria available to help you to select the best option for your buildings. Rolling loads capabilities vary by product, ranging from 250 to 1,000 pounds per wheel.

Installing a permanent entrance flooring system keeps your building clean and safe by trapping dirt and debris, reducing the risk of slip/fall accidents, and standing up to heavy rolling loads. Remember to side with a manufacturer that has trustworthy products and services to ensure safety and durability.

This article originally appeared in the issue of .

About the Author

Wade Brown, LEED-AP, CDT, is the senior manager–Product Marketing for Construction Specialties (www.c-sgroup.com). He can be reached at [email protected] or 800/233-8493.

Featured

  • UTampa Breaks Ground on STEM Academic Facility

    The University of Tampa in Tampa, Fla., recently broke ground on one of its largest academic facilities ever, according to a news release. The Dickey Science Innovation Center will measure 153,000 square feet and has a scheduled completion date of fall 2028.

  • Embry-Riddle Completes Construction on Research, Lab Facility

    Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced the end of construction on a new research and lab facility on campus. The Center for Aerospace Engineering II (CAT II) will support aerospace research and technology development and broke ground last summer.

  • University of Kansas Breaks Ground on Entrepreneurship Hub

    The University of Kansas in Lawrence, Kan., recently held a groundbreaking ceremony for the new KU Entrepreneurship Hub, according to university news. The Hub is part of the university’s School of Business and will include spaces for experiential learning and programming.

  • Dallas ISD Voters Approve $6.2B Bond Package

    Dallas ISD voters have approved a record-setting $6.2-billion bond package that district leaders say will modernize aging campuses, eliminate portable classrooms and reshape learning environments across one of the nation’s largest school systems.