Keeping Entrances Clean and Safe

Keeping your buildings clean and safe can be a challenge; utilizing a functional entrance flooring product at your entrances can make all the difference. This durable product is designed to protect entrances throughout a building, is located where building users frequently enter and exit, and is made from materials like aluminum or stainless steel.

Entrance flooring is designed to maintain a clean, safe entryway. As foot traffic enters the building, debris fall between the rails into the recessed area below. Trapping debris maintains surface traction and reduces slip/fall risks, especially in soggy conditions. To clean and maintain, facility crews simply roll back or lift the system to vacuum debris from the recessed area. This shortens cleaning time and creates a safer walkway. Because entrance flooring can either be recessed or surface-mounted, there is less risk for the product to dislodge and pose an additional threat.

An educational facility can encounter thousands of students and faculty each day. It could also see heavy machinery like scissor lifts, dollies, or vending machines. It is important to select entrance flooring that is proven to withstand heavy rolling loads and continual foot traffic. Many manufacturers have testing criteria available to help you to select the best option for your buildings. Rolling loads capabilities vary by product, ranging from 250 to 1,000 pounds per wheel.

Installing a permanent entrance flooring system keeps your building clean and safe by trapping dirt and debris, reducing the risk of slip/fall accidents, and standing up to heavy rolling loads. Remember to side with a manufacturer that has trustworthy products and services to ensure safety and durability.

This article originally appeared in the issue of .

About the Author

Wade Brown, LEED-AP, CDT, is the senior manager–Product Marketing for Construction Specialties (www.c-sgroup.com). He can be reached at [email protected] or 800/233-8493.

Featured

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

  • California High School Starts Construction on New CTE Building

    Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking.

  • modern college building with circuit and brain motifs

    Anthropic Introduces Claude for Education

    Anthropic has launched a version of its Claude AI assistant tailored for higher education institutions. Claude for Education "gives academic institutions secure, reliable AI access for their entire community," the company said, to enable colleges and universities to develop and implement AI-enabled approaches across teaching, learning, and administration.

Digital Edition