Campus Master Plan Unveiled at California School

Parallax Architects and The Archer School for Girls in Los Angeles, Ca. are pleased to unveil "Archer Forward," a bold and elegant Campus Master Plan proposed for the school’s historic campus. The Master Plan will help fulfill Archer’s promise and mission to provide an innovative 21st century education for girls while respecting the campus’ rich architectural history and neighborhood setting. Construction on “Archer Forward” is scheduled to begin in December; a groundbreaking ceremony will take place on December 8, 2017.

Archer School for Girls

The forward-looking plan represents the gold standard in girls’ education and how architecture can and should guide that mission. Having grown from just 30 students when it first began classes 22 years ago, to enrollment of nearly 500 students today, Archer found it imperative to expand its facilities and offerings to broaden its reach as a leading educational institution for today’s young women.

“Craig Jameson and Joseph Masotta of Parallax Architects conceived a master plan that conveys an absolute belief in our girls’ potential to succeed, ascend, and lead,” says Head of School Elizabeth English. “What is more, they have done so with an elegant yet powerful design that will further elevate Archer's campus as an icon among Los Angeles architecture.”

The "Archer Forward” plan combines two objectives. First, to preserve the campus’ signature historic building, the former Eastern Star Home—a 1931 Los Angeles Cultural Historic Monument, which architectural critic Aaron Betsky once claimed “seems to have come about as the result of centuries of thought and planning.” Second, to transform the existing grounds into an entirely new, all pedestrian campus encompassing approximately seven acres and four new buildings.

 New features include an Arrival Garden to welcome visitors to the campus; an Academic Center, to replace the existing building’s non-historic North Wing; an Athletic Center to support the Upper and Middle Schools’ physical education and athletic programs; a 350-seat Performing Arts Center; and a Visual Arts Center, all supported by parking facilities located below a new athletic field for soccer and softball.

Featured

  • Cleveland High School Breaks Ground on Modernization

    Portland Public Schools in Portland, Ore., recently announced that construction has begun on a modernization project for Cleveland High School, according to a news release. The existing building will be replaced with a new, 300,000-square-foot facility at the same site.

  • school building with glowing circuit board patterns

    AI Is Coming to Schools — But Most School Buildings Still Run on Institutional Memory

    As school districts race to introduce AI into classrooms, administration, and curriculum planning, another conversation is happening behind the scenes: How prepared are school facilities themselves for the operational demands AI will create?

  • Building Beyond Simulation: Creating Immersive Ecosystems for Healthcare Education

    Health sciences education is one of the fastest-growing facility types in colleges and universities. The demand for medical, nursing, and allied health professionals is driving the creation and renovation of medical simulation training facilities that provide students with real-world experience through advanced simulation-based learning.

  • New Jersey Day School Opens New Science & Entrepreneurship Building

    Saddle River Day School (SRDS) in Saddle River, N.J., recently celebrated the grand opening of the new Dr. Kristen Walsh Hall of Science & Entrepreneurship, according to a news release. The school partnered with DIG Architecture on the 32,000 square foot facility, completed on a 17-month construction timeline in time for the beginning of the new school year.