Campus Master Plan Unveiled at California School

Parallax Architects and The Archer School for Girls in Los Angeles, Ca. are pleased to unveil "Archer Forward," a bold and elegant Campus Master Plan proposed for the school’s historic campus. The Master Plan will help fulfill Archer’s promise and mission to provide an innovative 21st century education for girls while respecting the campus’ rich architectural history and neighborhood setting. Construction on “Archer Forward” is scheduled to begin in December; a groundbreaking ceremony will take place on December 8, 2017.

Archer School for Girls

The forward-looking plan represents the gold standard in girls’ education and how architecture can and should guide that mission. Having grown from just 30 students when it first began classes 22 years ago, to enrollment of nearly 500 students today, Archer found it imperative to expand its facilities and offerings to broaden its reach as a leading educational institution for today’s young women.

“Craig Jameson and Joseph Masotta of Parallax Architects conceived a master plan that conveys an absolute belief in our girls’ potential to succeed, ascend, and lead,” says Head of School Elizabeth English. “What is more, they have done so with an elegant yet powerful design that will further elevate Archer's campus as an icon among Los Angeles architecture.”

The "Archer Forward” plan combines two objectives. First, to preserve the campus’ signature historic building, the former Eastern Star Home—a 1931 Los Angeles Cultural Historic Monument, which architectural critic Aaron Betsky once claimed “seems to have come about as the result of centuries of thought and planning.” Second, to transform the existing grounds into an entirely new, all pedestrian campus encompassing approximately seven acres and four new buildings.

 New features include an Arrival Garden to welcome visitors to the campus; an Academic Center, to replace the existing building’s non-historic North Wing; an Athletic Center to support the Upper and Middle Schools’ physical education and athletic programs; a 350-seat Performing Arts Center; and a Visual Arts Center, all supported by parking facilities located below a new athletic field for soccer and softball.

Featured

  • Secret to Efficient, On-Time School Infrastructure & Modernization Projects is All in the Preparation

    Warmer weather and longer days make summer the ideal time for construction and modernization projects at educational facilities. School boards and construction firms must coordinate effectively to ensure that these projects do not extend even a single day into the school year and impede classroom operation.

  • University of Pittsburgh to Build New Residence Hall

    The Board of Trustees from the University of Pittsburgh in Pittsburgh, Penn., recently approved the construction of a new residence hall for first-year students, according to university news.

  • Phoenix School District Breaks Ground on New Prep Academy

    The Creighton Elementary School District near Phoenix, Ariz., recently broke ground on a campus replacement for Biltmore Preparatory Academy, according to a news release. The new space will allow the school to expand its enrollment by 50 percent for K–8 students and accommodate modern, collaborative learning styles.

  • Stanford Online Reveals New Immersive Learning Studio

    Stanford Online recently marked its 30th anniversary with the announcement of a new immersive learning studio, according to a university news release. The studio takes advantage of AI-powered and immersive learning technologies to continue delivering personalized and faculty-led education.