Campus Master Plan Unveiled at California School

Parallax Architects and The Archer School for Girls in Los Angeles, Ca. are pleased to unveil "Archer Forward," a bold and elegant Campus Master Plan proposed for the school’s historic campus. The Master Plan will help fulfill Archer’s promise and mission to provide an innovative 21st century education for girls while respecting the campus’ rich architectural history and neighborhood setting. Construction on “Archer Forward” is scheduled to begin in December; a groundbreaking ceremony will take place on December 8, 2017.

Archer School for Girls

The forward-looking plan represents the gold standard in girls’ education and how architecture can and should guide that mission. Having grown from just 30 students when it first began classes 22 years ago, to enrollment of nearly 500 students today, Archer found it imperative to expand its facilities and offerings to broaden its reach as a leading educational institution for today’s young women.

“Craig Jameson and Joseph Masotta of Parallax Architects conceived a master plan that conveys an absolute belief in our girls’ potential to succeed, ascend, and lead,” says Head of School Elizabeth English. “What is more, they have done so with an elegant yet powerful design that will further elevate Archer's campus as an icon among Los Angeles architecture.”

The "Archer Forward” plan combines two objectives. First, to preserve the campus’ signature historic building, the former Eastern Star Home—a 1931 Los Angeles Cultural Historic Monument, which architectural critic Aaron Betsky once claimed “seems to have come about as the result of centuries of thought and planning.” Second, to transform the existing grounds into an entirely new, all pedestrian campus encompassing approximately seven acres and four new buildings.

 New features include an Arrival Garden to welcome visitors to the campus; an Academic Center, to replace the existing building’s non-historic North Wing; an Athletic Center to support the Upper and Middle Schools’ physical education and athletic programs; a 350-seat Performing Arts Center; and a Visual Arts Center, all supported by parking facilities located below a new athletic field for soccer and softball.

Featured

  • California District Opens New Robotics Center

    The Fremont Union High School District (FUHSD) in Cupertino, Calif., recently held a Grand Opening ceremony for a new, district-wide Robotics Center, according to a news release. The 14,500-square-foot facility was designed by Quattrocchi Kwok Architects (QKA); Landmark Constructors served as the builder and Blach Construction as general construction manager.

  • Growing Allied Health Workforce Demands Fueling Greater Need for Higher Education Facilities

    With the demand for healthcare professionals at an all-time high, colleges and universities are challenged with supporting the workforce demands in their own communities. Careers in allied health generally require specific training and/or certification, with some positions requiring degrees, certified credentials, and continuing education.

  • CSU Starts Construction on New Engineering Building

    Colorado State University in Denver, Colo., recently began clearing space for the construction of the new Don and Susie Law Engineering Future Technologies Building, according to a news release.

  • R.I. District Holds Ribbon-Cutting Ceremony for New Elementary School

    Cranston Public Schools in Cranston, R.I., recently announced the completion of Gladstone Elementary School, according to a news release. The 100,000-square-foot facility serves as a replacement for the 1950s-era former building, and it consolidates the student, faculty, and staff populations of Gladstone and Arlington Elementary Schools.