Grayson College Gets Approval for New Construction

Grayson College CenterNew construction projects are planed in the upcoming months for Grayson College in Grayson County, TX. A new viticulture lab and student success building project were recently approved by the Grayson College Board of Trustees.

The new student success center will be located behind the administration building for the college (pictured), while the viticulture center will reside alongside the current Viticulture and Enology center.

The new student success center will feature administrative offices and also contain a math hub and testing center. The project will also provide much-needed study space for students. The viticulture lab and student success center are joining other recent planned construction projects at Grayson, including a 100-bed dorm and various other facility improvements on-campus.

The two projects are being funded by reserves budgeted by the institution without using bonds. Plyler Construction of Sherman, TX, will be handling both projects.

Featured

  • Fayetteville State University Opens New College of Education Building

    Fayetteville State University (FSU) in Fayetteville, N.C., recently celebrated the opening of a new $69.3-million College of Education building, according to a university news release.

  • Building Beyond Simulation: Creating Immersive Ecosystems for Healthcare Education

    Health sciences education is one of the fastest-growing facility types in colleges and universities. The demand for medical, nursing, and allied health professionals is driving the creation and renovation of medical simulation training facilities that provide students with real-world experience through advanced simulation-based learning.

  • Longwood University Hits Construction Milestone on New Music Education Facility

    Longwood University in Farmville, Va., recently celebrated the topping out of its new music education and performance facility, according to a news release. The university partnered with development and construction firm Skanska on the 63,800-square-foot facility, which began construction in August 2025 and has an estimated completion date of fall 2028.