Two School Construction Projects Completed in New York City

PS 338 Brooklyn NYEW Howell Construction Group, one of the region’s leading education, retail, cultural, government and healthcare builders, has completed two school construction projects for the School Construction Authority—P.S. 338, a new primary/intermediate school on Coney Island Avenue in Brooklyn, N.Y. as well as the expansion and renovation of P.S. 49 in Middle Village, Queens. Both projects were finished in time to accommodate students for the 2017-2018 school year.

Designed by Purcell Architects, P.S. 338 was built from the ground up to accommodate 742 students ranging from Pre-K to eighth grade. The 106,000-square-foot, $68.5-million project features five floors with a partial cellar. The construction comprised two major blocks; a five-story structure with the primary grades on the lower floors and the intermediate classes above. A separate five-story building will include, lower level cafeteria and gymnasium. The building is set back from Coney Island Avenue to provide a buffer from the sidewalk and street. The side streets allow for a drop off area for school buses and a wider sidewalk to ease congestion.  

EW Howell Construction Group was also awarded a contract to construct a 107,000-square-foot addition and renovation, for P.S. 49, a staple of the Middle Village, Queens community for generations. The $31.5-million project was designed by Ciardullo Architects, which kept the building’s original historic 1920s façade detail. The school is a designated site by the NYS Historic Preservation Office for its beautiful brick work and limestone facades. EW Howell added an ‘L’ shaped building to the outdoor area, which allows extra space for outdoor playgrounds and beautiful landscaped views of the Juniper Valley Park, and completed the interior renovation and exterior restoration.

In addition to P.S. 338 in Brooklyn and P.S. 49 in Queens, EW Howell’s Education Division, led by Vice President John K. Hagen, P.E., has completed several more projects for the School Construction Authority, whose mission is to design and construct safe, cost-effective and environmentally sound schools for communities in New York City. EW Howell has also worked on in Manhattan. EW Howell has also been awarded an addition and renovation project for P.S. 303in Forest Hills, expected to be complete in January 2021.

Founded in 1891, EW Howell Construction Group is a leading New York-based General Construction and Construction Management firm with offices in Manhattan and on Long Island.

Featured

  • Thomas F. Frist, Jr. College of Medicine

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Thomas F. Frist, Jr. College of Medicine has been recognized with an EDS 2025 Project of Distinction award in the category of New Construction.

  • New Campus Stadiums Evolve Beyond Sports into Community Assets

    New campus planning documents reveal an abundance of high interest in new stadiums, or renovations and repurposing projects for existing facilities. Many universities, in fact, are developing campus complexes with new stadiums as a draw for retail, hotels, and student housing. Multipurpose facilities with high-end features are being designed to attract large sports events of various types, concerts, and other university functions.

  • Tennant Company Launches Autonomous Floor Scrubber

    Cleaning equipment and solutions provider Tennant Company recently launched the new X6 ROVR, a mid-sized robotic scrubber designed for large commercial and light-industrial environments, according to a news release. The autonomous machine can clean up to 75,000 square feet peer cycle with minimal needs for manual assistance.

  • Washington University School of Medicine Completes $165M Expansion Project

    The Washington University School of Medicine in St. Louis, Mo., recently completed a vertical expansion of its Steven & Susan Lipstein BJC Institute of Health (BJCIH), according to a news release. The university partnered with Lawrence Group for the design of the six-floor addition, which cost about $165 million.

Digital Edition