CSU, Chico to Break Ground on New Physical Science Building

This week saw the unveiling of the first images of the new Physical Sciences Building at California State University, Chico (CSU, Chico), in Chico CA. The groundbreaking for the new facility, which will include new teaching facilities and equipment, will take place in the fall of 2018. The new building will help emphasize STEM disciplines, and also encourage collaboration between science and engineering students, and the campus community.

CSU Chico

Designed by San Francisco firm SmithGroupJJR and slated to open in Fall 2020, the building will house classrooms and labs for a host of science disciplines including chemistry, physics, and geology. The building also emphasizes spaces for students to come together in indoor and outdoor settings, and use the natural environment campus as a tool to enhance classroom and in-the-field science education. There will also be a hands-on lab space for K-12 students to come learn and work with CSU, Chico Students across a range of science disciplines. 

The new building is being envisioned with sustainability as a key component, with the design team being mindful of energy and water use required by science laboratories, and designing the facility in a way that will maximize overall energy savings. The building is being funded by system-wide Revenue Bond Program along with campus designated reserves.

Featured

  • DFW-Area District Opens New Replacement Middle School

    The Eagle Mountain-Saginaw Independent School District near Fort Worth, Texas, recently held a ribbon-cutting ceremony for a new replacement middle school campus, according to a news release. The new facility for Wayside Middle School, originally established in 1964, was built on the site of the former district administration building and funded through Bond Proposition A in 2023.

  • LAN, Inc. Opens Office in College Station, Texas

    Lockwood, Andrews & Newnam, Inc. (LAN) recently announced the opening of a new office in College Station, Texas, to support its regional client base, according to a news release. The organization provides engineering, design, and program management services for water, wastewater, transportation, stormwater, and education clients in the Brazos Valley.

  • UT System Approves First Funds for New Campus

    The University of Texas System Board of Regents recently approved funds to build the first facility of a new campus in far west Fort Worth, Texas, according to university news. UTA West will serve as a branch of the University of Texas at Arlington and is scheduled to open in fall 2028.

  • iPark 87

    Building a Future-Focused Career and Technical Education Center

    A district superintendent shares his team's journey to aligning student passions with workforce demands, and why their new CTE center could be a model for districts nationwide.