CSU, Chico to Break Ground on New Physical Science Building

This week saw the unveiling of the first images of the new Physical Sciences Building at California State University, Chico (CSU, Chico), in Chico CA. The groundbreaking for the new facility, which will include new teaching facilities and equipment, will take place in the fall of 2018. The new building will help emphasize STEM disciplines, and also encourage collaboration between science and engineering students, and the campus community.

CSU Chico

Designed by San Francisco firm SmithGroupJJR and slated to open in Fall 2020, the building will house classrooms and labs for a host of science disciplines including chemistry, physics, and geology. The building also emphasizes spaces for students to come together in indoor and outdoor settings, and use the natural environment campus as a tool to enhance classroom and in-the-field science education. There will also be a hands-on lab space for K-12 students to come learn and work with CSU, Chico Students across a range of science disciplines. 

The new building is being envisioned with sustainability as a key component, with the design team being mindful of energy and water use required by science laboratories, and designing the facility in a way that will maximize overall energy savings. The building is being funded by system-wide Revenue Bond Program along with campus designated reserves.

Featured

  • nursing students talk while studying in a hallway

    Elsevier Launches VR Simulation Solution for Nursing Students

    Elsevier has introduced Shadow Health Lab with Virtual Reality, a simulation platform that allows nursing students to interact with virtual patients and build clinical judgment skills in a safe, realistic environment.

  • Minnesota District Converts Middle School into Community Hub

    White Bear Lake Area Schools in White Bear Lake, Minn., recently announced the end of a major renovation project that converted a former middle school into a new centralized district and community hub, according to a news release.

  • Year-Round Schools Require Year-Round Indoor Air Quality Planning

    While many schools are out for the summer, year-round schools follow a more “balanced” schedule with shorter, more frequent breaks spaced throughout the school year. Even though this offers educational benefits, these facilities have less downtime for building maintenance. This can become an issue when facilities managers overlook the importance of routine HVAC maintenance and air duct cleaning services.

  • Chicago District Completes Construction on New Elementary School

    North Chicago School District 187 in North Chicago, Ill., recently held a ribbon-cutting ceremony for the new Forrestal Elementary School, according to a news release. The new school marks a major investment in military-connected students and families at Naval Station Great Lakes.