Construction Begins on Connecticut High School

Construction is underway for the new Ella T. Grasso Technical High School in Groton, Conn. The 226,000-square-foot facility, designed by Moser Pilon Nelson Architects, is being built on a parcel contiguous to the existing technical high school. When the school opens for the 2019-20 school year, the existing facility will be demolished to make room for future athletic fields and facilities.

“We are very excited to have construction underway after more than a decade of planning efforts,” says Richard B. Brown, AIA, principal-in-charge of the project. “The new building will enable the student enrollment to grow to over 800 students and to do so in a facility with instruction in a dozen skilled trades.”

The $98-million project is scheduled to be completed in June of 2019. Moser Pilon Nelson is based in Wethersfield, Connecticut.

Ella T Grasso High School

Featured

  • Designing the Bridge Between Inclusivity and Independence in K–12 Schools

    Fostering independence is fundamental to learning and development for K–12 students. It offers many proven benefits, such as enhanced confidence, problem-solving, decision-making, and social skills. However, this foundational objective loses its impact if it’s not accessible and adaptable to all students. Inclusivity plays a critical role in cultivating independence and healthy autonomy for students, fostering positive student learning outcomes by uniting pedagogy with the physical learning environment.

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • Minnesota District Converts Middle School into Community Hub

    White Bear Lake Area Schools in White Bear Lake, Minn., recently announced the end of a major renovation project that converted a former middle school into a new centralized district and community hub, according to a news release.

  • ed tech conference calendar

    Upcoming Awards, Events & Webinars