University of New Mexico Starts Construction on Science Center

The University of New Mexico (UNM), in Albuquerque, recently celebrated the start of construction on the university’s new Physics & Astronomy Interdisciplinary Science Center (PAIS Center). The aim of the new science facility is to create a flexible, collaboration-focused space on campus for all types of science education.

University of New Mexico Starts Construction on Science Center

The new facility will feature offices, labs, and special spaces that are strategically placed to maximize construction and energy efficiency. There will also be a light-filled entry space, a courtyard, and a lounge area for occupants. At 137,200 square feet, the PAIS Center will also be the largest building on the campus of UNM.

The PAIS Center project is being helmed by VHGArchitects with EYP of Boston serving as consultants for the building’s laboratory spaces. The PAIS is slated to open in July 2019.

Featured

  • Ancient Resilience: How Indigenous Intelligence Shapes the 4Roots Education Building

    As climate change intensifies, educational spaces must evolve beyond basic sustainability toward true resilience – we must design environments that can adapt, respond, and thrive amid shifting, and intensifying, climate hazards. Drawing on indigenous wisdom and nature-based strategies, integrating resilient design offers a path to create learning environments that are not only functional but deeply in tune with their natural surroundings.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • New Jersey PreK–12 School Breaks Ground on New STEM Building

    Saddle River Day School (SRDS) in Saddle River, N.J., recently announced that it has broken ground on the new Dr. Kristen Walsh Hall of Science & Entrepreneurship, according to a news release. The school partnered with DIGroup Architecture for the design of the new facility, which will provide the school with space to expand its STEM and business education classes.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

Digital Edition