KCU Breaks Ground on Center for Medical Education Innovation

The Kansas City University of Medicine and Biosciences (KCU) in Kansas City, MO, recently broke ground for the new Center for Medical Education Innovation (CMEI). The new facility will provide advanced technologies and clinical experiences for student physicians and health science professionals.

Kansas City University of Med CMEI

Consisting of four levels, the new space is being built in a way that will allow for further additions in the coming years as new medical technologies develop. Along with standard patient rooms, CMEI features areas for professional and academic research at KCU, and a host of spaces that invite and encourage collaboration between medical students and scientific researchers.

Helix Architecture and Design and CO Architects are handling the design of the building with construction responsibilities being overseen by J.E. Dunn Construction Company.

Featured

  • Fayetteville State University Opens New College of Education Building

    Fayetteville State University (FSU) in Fayetteville, N.C., recently celebrated the opening of a new $69.3-million College of Education building, according to a university news release.

  • Building Beyond Simulation: Creating Immersive Ecosystems for Healthcare Education

    Health sciences education is one of the fastest-growing facility types in colleges and universities. The demand for medical, nursing, and allied health professionals is driving the creation and renovation of medical simulation training facilities that provide students with real-world experience through advanced simulation-based learning.

  • Longwood University Hits Construction Milestone on New Music Education Facility

    Longwood University in Farmville, Va., recently celebrated the topping out of its new music education and performance facility, according to a news release. The university partnered with development and construction firm Skanska on the 63,800-square-foot facility, which began construction in August 2025 and has an estimated completion date of fall 2028.