University of Colorado Boulder Aerospace Engineering Building Nears Completion

The University of Colorado Boulder (CU) is celebrating the final stages of construction for the new Aerospace Engineering Building on their Boulder, CO, campus. The final steel beam was recently installed on the project, which broke ground in October of 2017.

The Aerospace Engineering Building is designed to serve as a place to build partnerships between CU engineering students and the aerospace industry, both within Colorado and nationally. The new facility will feature labs and collaborative learning spaces for advanced aerospace research.

University of Colorado Aerospace Engineering Building

Hord Coplan Macht is the designer for the project, with Whiting Turner acting as the construction management firm. The new building is slated for completion in July of 2019.

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.