Railing Enhances Openness of Student Center

Trex Commercial Products

Trex Commercial Products’ Track Rail helped create overlooks that enhanced the open-concept plan of the new Jim and Martie Bultman Center’s lobby at Hope College.

Hope College in Holland, MI, is a private liberal-arts college known for providing research-based education to a diverse body of students. In 2017, the college was in the midst of planning its first new student center in over 35 years. This new facility—The 42,000-square-foot Jim and Martie Bultman Center—would be designed to have a large multipurpose room, a lounge, student study areas, and a coffee shop.

In designing the Bultman Student Center, architects placed an emphasis on “openness.” The college wanted a building that made students feel welcome, and promoted inclusion amongst all members of the campus community. With this in mind, the plan and design of the new space focused on a building layout that promoted lightness and a freedom of movement among the various floors and rooms. A visual connection between spaces was important.

As the design process progressed, architects realized they would need a sturdy railing to accompany the open-concept lobby of the facility. After researching various options, they recommended, and Hope chose, Trex Commercial Products’ (TCP) Track Rail. The minimalist rail would help create safe overlook areas so students could see into the lobby of the center from different floors, creating an overall feeling of connectedness and inclusiveness. The railing would be coupled with tempered glass and attached to the wall.

Over 341 linear feet of Track Rail were used in the new facility. The new rails fit in perfectly with the warm architectural accents of the building. These warm accents and open areas help make the new facility stand out as a central part of the campus community that all students, faculty, and staff can be a part of. With a quick installation time, TCP’s Track Rails were in place and ready when the Bultman Student Center opened at the start of the 2017-2018 academic year.

www.trex.com

This article originally appeared in the College Planning & Management July/August 2018 issue of Spaces4Learning.

Featured

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

  • Minnesota Middle School Finishes $23.5M Addition and Modernization

    Highland Park Middle School in St. Paul, Minn., recently announced the completion of a $23.5-million addition and remodel project, according to a news release. Saint Paul Public Schools partnered with ATS&R Planners, Architects & Engineers for its design and Kraus-Anderson for its construction.

  • iPark 87

    Building a Future-Focused Career and Technical Education Center

    A district superintendent shares his team's journey to aligning student passions with workforce demands, and why their new CTE center could be a model for districts nationwide.

Digital Edition