Railing Enhances Openness of Student Center

Trex Commercial Products

Trex Commercial Products’ Track Rail helped create overlooks that enhanced the open-concept plan of the new Jim and Martie Bultman Center’s lobby at Hope College.

Hope College in Holland, MI, is a private liberal-arts college known for providing research-based education to a diverse body of students. In 2017, the college was in the midst of planning its first new student center in over 35 years. This new facility—The 42,000-square-foot Jim and Martie Bultman Center—would be designed to have a large multipurpose room, a lounge, student study areas, and a coffee shop.

In designing the Bultman Student Center, architects placed an emphasis on “openness.” The college wanted a building that made students feel welcome, and promoted inclusion amongst all members of the campus community. With this in mind, the plan and design of the new space focused on a building layout that promoted lightness and a freedom of movement among the various floors and rooms. A visual connection between spaces was important.

As the design process progressed, architects realized they would need a sturdy railing to accompany the open-concept lobby of the facility. After researching various options, they recommended, and Hope chose, Trex Commercial Products’ (TCP) Track Rail. The minimalist rail would help create safe overlook areas so students could see into the lobby of the center from different floors, creating an overall feeling of connectedness and inclusiveness. The railing would be coupled with tempered glass and attached to the wall.

Over 341 linear feet of Track Rail were used in the new facility. The new rails fit in perfectly with the warm architectural accents of the building. These warm accents and open areas help make the new facility stand out as a central part of the campus community that all students, faculty, and staff can be a part of. With a quick installation time, TCP’s Track Rails were in place and ready when the Bultman Student Center opened at the start of the 2017-2018 academic year.

www.trex.com

This article originally appeared in the College Planning & Management July/August 2018 issue of Spaces4Learning.

Featured

  • illustration of a school building under construction

    One District, One Way: Bringing Consistency to K–12 Construction Projects

    From budgeting to closeout, here's how a single playbook can turn chaos into clarity in school construction programs.

  • Embry-Riddle Breaks Ground on New Office Building

    Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced that construction has begun on a new office building for its campus Research Park, according to a news release. The university partnered with Hoar Construction on the 34,740-square-foot Center for Aerospace Technology II (CAT II), which will be used for research and lab purposes.

  • California High School Starts Construction on STEAM, Music Buildings

    Tamalpais High School, part of the Tamalpais Union High School District, recently broke ground on two new major facilities for its campus in Mill Valley, Calif., according to a news release. The district is partnering with Quattrocchi Kwok Architects (QKA) and Lathrop Construction Associates for the Science Technology, Engineering, Arts, and Mathematics (STEAM) and Music Buildings, both replacing their outdated counterparts.

  • Brightly Software, XOi Partner for New HVAC Data Solution

    Siemens company Brightly Software recently announced a partnership with data intelligence company XOi to integrate real-time HVAC system data into Brightly’s Asset Essentials CMMS, according to a news release. The integration will allow facilities more insight into HVAC system performance, health, and risk across their operations.

Digital Edition