Ground Breaking Celebrated for Connecticut High School

A ground breaking was held recently for a modernized New London High School in New London, Conn. The North Campus project is going to be home to students in grades 6 through 12 and will feature special facilities for STEM, visual and performing arts and foreign languages.

New London High School

The project will cost roughly $98 million and will begin with a complete reconstruction of the running track, which is on-track for an August completion. New construction on New London’s South Campus is expected to begin in 2019 following the completion of initial phases of the North Campus.

Featured

  • FGCU Breaks Ground on New Health Sciences Building

    Florida Gulf Coast University (FGCU) has launched construction on a major new academic facility that leaders say will reshape healthcare education in Southwest Florida for decades to come, according to university news.

  • Utah Valley University Opens New Engineering Building

    Utah Valley University in Orem, Utah, recently held a grand-opening ceremony for the new Scott M. Smith Engineering Building, according to a news release. The facility is one of the largest engineering buildings in the state at almost 200,000 square feet, and it plays home to the university’s Smith College of Engineering and Technology (SCET).

  • Construction Begins on New University Research Vessel

    Boat-building company All American Marine recently announced that it has begun construction on a new catamaran research vessel for the University of Texas Marine Science Institute (UTMSI) in Port Aransas, Texas, according to a news release.

  • UTampa Breaks Ground on STEM Academic Facility

    The University of Tampa in Tampa, Fla., recently broke ground on one of its largest academic facilities ever, according to a news release. The Dickey Science Innovation Center will measure 153,000 square feet and has a scheduled completion date of fall 2028.