Drexel University: College of Engineering Innovation Studio

Drexel University

PHOTOS © PAUL BARTHOLOMEW and © JEFFREY TOTARO

For Drexel University’s reimagined College of Engineering “Innovation Studio,” Philadelphia’s Coscia Moos Architecture combined the raw edges of makerspace with bright color, glass volumes, and environments designed to encourage interaction and collaboration. The 55,000-square-foot adaptive reuse of a former warehouse puts a sophisticated spin on engineering education for the Philadelphia-based institution.

The design transfers the engineering student experience beyond the academic classroom into an entrepreneurial environment that fosters creativity, exploration, and discovery. By consolidating freshman teaching labs from locations across campus, relocating select electrical engineering researchers, and establishing a home for the university’s new Institute for Energy and the Environment (IExE), the design encourages undergraduate and grad students of all ages and faculty to comingle, share ideas, and elevate Drexel’s STEM education.

Drexel and Coscia Moos envisioned the new facility as a critical part of students’ contributions to the Maker Movement, a trend toward design and development of products brought to market better, faster, and at a lower cost. In fact, freshmen in the College of Engineering work throughout their first year on hands-on multidisciplinary projects encompassing all areas of engineering. They learn to collaborate in teams, solve problems, and experience the real-world challenges of engineers, skills that inform the remainder of their education.

The carefully planned environment features writable walls, acoustical partitions to subdivide the space, movable tables, varied seating, ample electrical outlets, and a host of devices, including 3D printers, welding and electrical testing equipment, heavy machinery, and a wet lab.

Interspersed among the makerspaces are offices and glass-box conference rooms that quite literally put dialogue in the center of the action.

This article originally appeared in the College Planning & Management September 2018 issue of Spaces4Learning.

Featured

  • Enjoy Tax and Energy Savings with the Right Ceiling Solutions

    Thanks to recent innovations pairing mineral fiber ceiling panels with phase change material technology (PCM), architects, designers, facility managers, and other key players in construction and renovation projects are re-thinking the role ceilings play in supporting environmental objectives—especially energy savings.

  • Tennant Company Launches Autonomous Floor Scrubber

    Cleaning equipment and solutions provider Tennant Company recently launched the new X6 ROVR, a mid-sized robotic scrubber designed for large commercial and light-industrial environments, according to a news release. The autonomous machine can clean up to 75,000 square feet peer cycle with minimal needs for manual assistance.

  • Florida Elementary School to Undergo $47M Reconstruction

    The School District of Osceola County in Kissimmee, Fla., recently announced a partnership with construction firm Skanska to reconstruct Reedy Creek Elementary School, according to a news release. The $47-million project will involve the new construction of a 96,000-square-foot academic center, renovating the remaining facilities, a full-site redevelopment, and demolishing portions of the existing school.

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

Digital Edition