New Chemistry Building for Ohio University

Ohio University ChemistryGroundbreaking was held in August for a new state-of-the-art chemistry building on the campus of Ohio University in Athens, OH. The 69,000-square-foot building will feature student and faculty collaboration spaces, research laboratories, and faculty and graduate student offices. The new building is projected to open in the summer of 2020. The project is estimated to cost $42.6 million.

The first floor of the new building will also include a space for shared research instrumentation, and will put research activity on display next to the undergraduate student labs. Upper floors will feature laboratories and offices, as well as collaboration and conference rooms.

The building is situated to preserve nearby old growth sycamore trees.

Featured

  • FGCU Breaks Ground on New Health Sciences Building

    Florida Gulf Coast University (FGCU) has launched construction on a major new academic facility that leaders say will reshape healthcare education in Southwest Florida for decades to come, according to university news.

  • Utah Valley University Opens New Engineering Building

    Utah Valley University in Orem, Utah, recently held a grand-opening ceremony for the new Scott M. Smith Engineering Building, according to a news release. The facility is one of the largest engineering buildings in the state at almost 200,000 square feet, and it plays home to the university’s Smith College of Engineering and Technology (SCET).

  • Construction Begins on New University Research Vessel

    Boat-building company All American Marine recently announced that it has begun construction on a new catamaran research vessel for the University of Texas Marine Science Institute (UTMSI) in Port Aransas, Texas, according to a news release.

  • UTampa Breaks Ground on STEM Academic Facility

    The University of Tampa in Tampa, Fla., recently broke ground on one of its largest academic facilities ever, according to a news release. The Dickey Science Innovation Center will measure 153,000 square feet and has a scheduled completion date of fall 2028.