Simulation Lab Opens at Yale School of Nursing

The Yale School of Nursing is celebrating the opening of its new Simulation Lab and classroom expansion in West Haven, CT, with facilities designed by architecture, art and advisory firm Svigals + Partners. The $5 million project, led by Svigals + Partners with construction manager Shawmut Design and Construction, has transformed more than 8,000 square feet of space in less than one year, readied in time for the fall semester’s start.

Yale Nursing

The teaching center design integrates two new classrooms with a primary care assessment lab as well as six standardized patient examination rooms. It also offers a one-bedroom apartment layout, used for home-care simulation. Additional upgrades went toward improving the Center for Biobehavioral Health Research and a café on the first floor of the Yale building.

The new, state-of-the-art teaching spaces are designed to "help prepare future Yale nurses to address where health care is going, such as outpatient, disaster, and telehealth care,” says Ann Kurth, dean of the Yale School of Nursing. 

Featured

  • FGCU Breaks Ground on New Health Sciences Building

    Florida Gulf Coast University (FGCU) has launched construction on a major new academic facility that leaders say will reshape healthcare education in Southwest Florida for decades to come, according to university news.

  • Benson Polytechnic High School in Portland, OR

    Preserving Legacy, Designing for the Future

    As historic academic buildings age, institutions face a difficult decision: preserve and adapt or demolish and rebuild. How do we honor the legacy of these spaces while adapting them to meet the needs of modern learners?

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.

  • How a Portable Sink Helped an Art Classroom Run More Smoothly

    Classroom design decisions can have outsized effects on instructional time and safety at schools juggling mismatched infrastructure, strict budgets, and crowded schedules — particularly in the arts. Between spilled paint and dirty brushes, art classes run smoother with a sink in the studio. But many schools don’t have a sink in every art classroom.