Ribbon Cutting Held at Colchester Middle School

A ceremonial ribbon cutting was held at the William J. Johnston Middle School in Colchester, Ct., on Aug. 24 to celebrate the opening of the school’s new administrative and classroom wing.

Colchester Middle School

O&G Industries, the construction manager for the project, was responsible for overseeing the construction of the 70,000-square-foot addition, which includes the new main entrance, administrative offices, cafeteria, media center, multipurpose room/black box theater, and over more than classrooms. Site improvements related to the addition include a new courtyard and patio with expanded parking and redesigned bus and pick up loops that will optimize traffic flow.

Phase 2 of the project includes a 29,000-square-foot renovation of the school’s west wing, which includes a gym, kitchen, cafe, choral, and band rooms. The project will be fully completed in the winter of 2019.

Featured

  • Enjoy Tax and Energy Savings with the Right Ceiling Solutions

    Thanks to recent innovations pairing mineral fiber ceiling panels with phase change material technology (PCM), architects, designers, facility managers, and other key players in construction and renovation projects are re-thinking the role ceilings play in supporting environmental objectives—especially energy savings.

  • PNSI Global Alliance Launches New Quality Assurance Certification

    PNSI Global Alliance, a network of technology integrators and service providers, recently introduced a new Quality Assurance Certification (QAC) for AV service and support, according to a press release. The two-day, interactive workshop QAC course is designed for Certified Solution Providers (CSPs) to provide them with the most up-to-date and advanced quality assurance knowledge available.

  • Active Learning Classroom

    Striking a Balance: The Keys to Renovating Science Education Buildings for the 21st Century

    The recent renovation of the Durham Science Center at the University of Nebraska-Omaha (UNO) provides a roadmap for facilities managers tasked with balancing budget constraints, modern pedagogical demands, and long-term sustainability.

  • a traditional red brick school building with the right side visibly deteriorated and the left side well-maintained, surrounded by neat landscaping

    Making the Grade: Navigating Funding Uncertainty in K-12 Schools

    School districts across the country must prepare for all possible funding scenarios by analyzing school asset and infrastructure conditions, understanding their funding needs, and developing a proactive maintenance strategy to stretch their funding dollars.

Digital Edition