APPA'S Five Levels of Cleanliness

APPA specifies five levels of cleanliness that many institutions, including colleges and universities, use to manage their cleaning efforts. What follows is a summary of APPA’s five levels. A more detailed rundown is available on the APPA website (www.appa.org).

Level 1: Orderly Spotlessness:
Floors and base moldings are bright and clean; colors are fresh. Vertical and horizontal surfaces look freshly cleaned or polished. No build-up in corners. The lights work and the fixtures are clean. Washroom and shower fixtures and tiles gleam. Adequate cleaning supplies are on hand. Trash containers contain only daily waste.

Level 2: Ordinary Tidiness:
Virtually the same as level one, but there may be up to two days of dust, dirt, stains, or streaks.

Level 3: Casual Inattention:
Floors are swept or vacuumed clean, but close observation may reveal stains and dirt build-up may be apparent in corners and along walls. In addition, there may be dull spots, matted carpet, and streaks on base molding. Vertical and horizontal surfaces have dust, dirt, marks, smudges, and fingerprints. Lamps work and fixtures are clean. Trash containers have daily waste only.

Level 4: Moderate Dinginess:
Floors are swept and vacuumed clean but may be stained. Dirt buildup is evident. Carpets show paths of use. Molding is dirty. Surfaces are obviously dusty and dirty. Trash containers have old trash and may give off a sour smell.

Level 5: Unkempt Neglect:
Dull, dirty scuffed floors and carpets. The corners and base moldings are obviously dirty. Dirt has accumulated on all vertical and horizontal surfaces. Light fixtures are dirty, and some lamps are burned out. Trash containers are overflowing and have begun to smell.

This article originally appeared in the College Planning & Management October 2018 issue of Spaces4Learning.

Featured

  • Tennessee Middle School Completes Health, Life Safety Renovations

    The Giles County Board of Education in Pulaski, Tenn., recently announced that a series of renovation projects has been completed at Bridgeforth Middle School, according to a news release. The district partnered with Wold Architects & Engineers and Brindley Construction to modernize building systems at one of the district’s oldest schools.

  • UTampa Breaks Ground on STEM Academic Facility

    The University of Tampa in Tampa, Fla., recently broke ground on one of its largest academic facilities ever, according to a news release. The Dickey Science Innovation Center will measure 153,000 square feet and has a scheduled completion date of fall 2028.

  • Zurn Elkay Releases 2025 Sustainability Report

    Zurn Elkay Water Solutions recently announced the release of its annual sustainability report, according to a news release. The 2025 report discusses the organization’s efforts to maintain good environmental stewardship and the solutions provided in helping customers meet sustainability goals.

  • St. John Fisher University

    Classroom Revitalization – Basil Hall Room 216

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. St. John Fisher University's Basil Hall Room 216 Classroom Revitalization has been recognized with an EDS 2026 Project of Distinction award in the category of Spaces.