Things to Know About Wall Protection

Wall protection is a necessity in busy environments to preserve the look of a building and reduce continuous maintenance and repair costs. Here are three things to keep in mind when choosing wall protection.

1. Location.
Deciding on the placement of wall protection can be a challenge. Common areas, like gymnasiums and cafeterias, are prone to wall damage from moving furniture and equipment and may be good starting points. Knowing where damaging objects may regularly hit a wall can help determine where the protection should be placed.

2. Levels of impact.
Wall protection products should be chosen based on the amount of impact the wall may encounter. These products include feature rails, crash rails, rigid sheet, and more. Feature rails can withstand lighter impact from objects such as chairs. Crash rails and corner guards are thicker and designed to keep items further from the wall while withstanding more frequent, intense impacts. Rigid sheet wall protection provides significantly more protection from damage than Type II commercial wall covering. Wall panels are an even more durable option for protection from heavier impacts, as they are considerably thicker. Utilizing wall protection will reduce maintenance and labor costs like drywall repairs and repainting.

3. Special conditions and applications.
Curves and radiuses play a large role in architecture. Graphic wall protection can be used around a column to create unique design elements, such as the imitation of a marble column in a highend space. Certain handrails can be specified for wide or tight wall radiuses. They can even be formed at custom angles on a horizontal plane for ramps and transitions, ensuring mobility and stability for those who rely on both.

This article originally appeared in the College Planning & Management October 2018 issue of Spaces4Learning.

About the Author

Renee Hite is the assistant Business Development manager for interior wall protection at Construction Specialties. To learn more visit www.c-sgroup.com, call 800/233-8493 or email Renee at [email protected].

Featured

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • Illinois State University Breaks Ground on College of Fine Arts Transformation

    Illinois State University in Normal, Ill., recently held a groundbreaking ceremony for the Wonsook Kim College of Fine Arts transformation project, according to university news. The series of new constructions and renovations will upgrade spaces in Centennial East, the Center for the Visual Arts, and the Center for the Performing Arts, as well as replace the existing Centennial West facility with a new Commons Building.

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.

  • Miami University Approves New $242M Multipurpose Arena

    Miami University in Oxford, Ohio, recently announced that its Board of Trustees has approved construction of a new multipurpose arena at Cook Field, according to university news. The $242-million project will serve as a new centralized hub for student life and create space for economic development on campus.