Newly Renovated, Energy-Efficient School Opens for Sixth Grade Class

The newly renovated Gibbs School opened in September to accommodate the sixth-grade class, and a ribbon-cutting took place on Sunday October 21st. Finegold Alexander Architects served as the architect of record for the project, NV5 was Owner’s Project Manager, and Shawmut Design and Construction was Construction Manager.

Gibbs School

“The Town of Arlington is excited to complete the renovation and open the Gibbs School,” said Kristin DeFrancisco, Gibbs School Principal. “We are thrilled to be able to provide a school building that was carefully designed to meet the academic and social emotional needs of the sixth graders in Arlington, while being cost-effective and efficient.” Finegold Alexander Architects worked closely with the Arlington Permanent Town Building Committee; Superintendent, Kathleen Bodie; Gibbs School Principal, Kristin DeFrancisco; and Director of Facilities, Steve Nesterak to ensure the design reached these goals.

The 69,000-square-foot Gibbs building was originally built as a school in 1928.  It was renovated and a new addition was added in 1973. The school was de-commissioned approximately 25 years ago due to a decrease in enrollment, and then was leased to non-profit organizations, including the Lesley Ellis School and the Arlington Center for the Arts.  

“The goal was to create a welcoming environment that would inspire students to seek opportunities for learning,” said Regan Shields Ives, Principal, Finegold Alexander, who served as Project Manager. “The result is a flexible, engaging learning environment that is also highly energy efficient.” The project is on track to achieve LEED Silver V4 for Schools.

The renovation created flexible classrooms, as well as breakout collaborative spaces in the corridors fit out with technology and seating to allow for smaller group learning. There is a new, redefined main entrance and canopy on the Foster Street side of the school, designed to create a warm, safe and inviting approach. A Media Center was created in the former original Auditorium to create flexible learning clusters with group meeting tables, individual work spaces, and a mezzanine large enough to accommodate a full class of students.  

“This design was truly inspired by how students learn and what they need in today’s learning environment,” said Tony Hsiao, Principal, Finegold Alexander. “The design required creative thinking to work within the boundaries of the existing building envelope. The result is spectacular, a place to motivate students and teachers alike to reach for excellence in education.”

The first floor contains a cafeteria, language classrooms, flexible theatre space, music classroom, technology lab, and administration offices. The second floor consists of two clusters of four classrooms with breakout spaces, a gymnasium, art studio, digital media lab, and media center. The third floor includes another two clusters of classrooms with breakout spaces. There is also an outdoor classroom, community garden space, and rubber play surface for recess. The parking lot now includes two electric car charging stations.

For more information, visit www.faainc.com.

Featured

  • Spaces4Learning Launches 2026 Education Design Showcase Awards

    Spaces4Learning has opened submissions for the 2026 Education Design Showcase! The awards program launched in 1999 with the goal of celebrating innovative, practical solutions in the planning, design, and construction of K–12 and higher-education facilities. EDS recognizes new developments that help achieve optimal learning environments, as well as the architecture firms that brought the ideas to life.

  • South Texas K–12 District Debuts Region’s First Electric Bus Fleet

    The Valley View Independent School District in Pharr, Texas, recently announced a partnership with Highland Electric Fleets to launch the district’s—and the region’s—first fleet of all-electric school buses, according to a news release.

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Countway Library at Harvard Medical School

    From Shadows to Sanctuary: The Transformation of Light at Countway Library

    The renovation of Countway Library at Harvard Medical School demonstrates how biophilic design and advanced lighting strategies transformed a formerly dark, insular space into a vibrant, welcoming hub that supports wellness, learning, and community engagement.

Digital Edition