New Athletic Performance Center at St. Mark’s School Completed

Southborough, Mass. – Students returned from summer vacation to find a brand new athletic performance center at St. Mark’s School, ready for full use for the fall season.  Revitalized by Erland Construction and S3 Design, the state-of-the-art T. Jefferson Coolidge, Jr. ’50 Athletic Performance and Wellness Center is designed to support students’ academic success through fitness and conditioning.  

St. Mark's

Located inside Elkins on campus, the 4,000-square-foot Coolidge Center has nearly doubled the size of St. Mark’s athletic space and includes top-quality recreation equipment, space for free weights, floor pads for safe strength training, and new cardiovascular machines. The Center also provides office space and additional storage for the school’s Athletics Department, including amenities such as a laundry service for team uniforms.

“Our team felt great satisfaction in repurposing and revitalizing this underutilized space within the circa 1930s Field House to create a popular destination for St. Mark’s athletes to train,” said Scott Bates, V.P., Academic, Corporate and Commercial Group Manager.  “We’re proud to have partnered with S3 Design and St. Mark’s to support the school’s growing athletic and wellness needs and to finish the project on time in three months for the start of the school year.” 

The renovation of the Coolidge Center also included updating the sprinkler system, upgrading MEP systems, and enclosing two open-air walkways adjacent to the main lobby.

Over the past 41 years, Erland Construction has successfully grown into the Northeast’s leading open shop construction management and general contracting firm. The Company is headquartered in Burlington, Massachusetts and has specialized expertise for new construction, additions, and renovations in major market sectors including academic, residential, corporate, advanced technology/life sciences, commercial, senior living and hospitality. For more information, visit www.erland.com.

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Pitzer College

    Designing for Change in Higher Ed Learning Environments

    Higher education will continue to evolve, and learning environments must evolve with it. By prioritizing adaptable infrastructure, thoughtful reuse, strong energy performance, and wellness-centered design, campuses can create spaces that support learning today while remaining flexible for the future.

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

  • LSU Breaks Ground on $200M Residential Project

    Louisiana State University in Baton Rouge, La., recently broke ground on a new residential complex, according to university news. The South Quad residential project will consist of two buildings and add a total of 1,266 beds for freshmen students. The development comes with a price tag of $200 million, and it’s scheduled to open to students in fall 2027.

Digital Edition