Florida Southern College Breaks Ground on New School of Physical Therapy

Florida Southern College (FSC) in Lakeland, FL, recently broke ground on its new School of Physical Therapy, a stunningly designed facility that will supply highly trained physical therapists to healthcare facilities in central Florida and beyond. The new Schoolwill be strategically located on South Florida Avenue in Lakeland, less than a mile from FSC’s main campus.

Southern Florida

Renovation and construction work is underway on an existing 6,500-square-foot building, with an 11,000-square-foot addition to come. The structure will be a great addition to the Dixieland corridor, a historic district in Lakeland. Scheduled to open in August 2019, the building will include faculty offices, classrooms, and a state-of-the-art lab.

The architect on the project is Wallis Murphey Boyington Architects, with construction work to be completed by Rodda Construction. Mike Murphey, WMB partner with ROI Solutions, said the building’s design is inspired by the work of architect Frank Lloyd Wright, notably including elements reminiscent of the colored-glass “textile blocks” Wright incorporated into his designs for the Florida Southern campus.

Featured

  • Fayetteville State University Opens New College of Education Building

    Fayetteville State University (FSU) in Fayetteville, N.C., recently celebrated the opening of a new $69.3-million College of Education building, according to a university news release.

  • Building Beyond Simulation: Creating Immersive Ecosystems for Healthcare Education

    Health sciences education is one of the fastest-growing facility types in colleges and universities. The demand for medical, nursing, and allied health professionals is driving the creation and renovation of medical simulation training facilities that provide students with real-world experience through advanced simulation-based learning.

  • Longwood University Hits Construction Milestone on New Music Education Facility

    Longwood University in Farmville, Va., recently celebrated the topping out of its new music education and performance facility, according to a news release. The university partnered with development and construction firm Skanska on the 63,800-square-foot facility, which began construction in August 2025 and has an estimated completion date of fall 2028.