Vanguard University Breaks Ground on Student Center

Vanguard University in Costa Mesa, CA, broke ground in November on a new $23 million, 35,000-square-foot Student Center, which will serve the immediate needs of the university’s current enrollment and provide additional space to accommodate future growth.

Vanguard University Student Center

The new state-of-the-art steel-framed structure will replace the existing student union and feature a 16,000-square-foot cafeteria, 3,000-square-foot fitness center, and 8,200-square-foot multipurpose events space. It also will include a student lounge with ample seating, a fireplace, and café.

The building’s roof will feature a trellised deck and fireplace, and other outdoor dining and gathering areas will be constructed around the perimeter of the building to promote student, faculty, and staff interaction.

Designed by HPI Architecture and built by C.W. Driver Companies, the building will reflect a traditional Santa Barbara style that complements the existing architecture on campus, incorporating a smooth plaster finish, limestone veneer, and clay tile roof.

Completion is anticipated for Q4 2019.

Featured

  • Hawaii Elementary School Breaks Ground on New Classroom Building

    Kealakehe Elementary School in Kailua, Hawaii, recently began construction on a new, $16-million classroom building for its campus, according to a news release. The 13,000-square-foot building will stand two stories and connect the existing upper and lower campuses.

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.

  • Embry-Riddle Completes Construction on Research, Lab Facility

    Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced the end of construction on a new research and lab facility on campus. The Center for Aerospace Engineering II (CAT II) will support aerospace research and technology development and broke ground last summer.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.