Vanguard University Breaks Ground on Student Center

Vanguard University in Costa Mesa, CA, broke ground in November on a new $23 million, 35,000-square-foot Student Center, which will serve the immediate needs of the university’s current enrollment and provide additional space to accommodate future growth.

Vanguard University Student Center

The new state-of-the-art steel-framed structure will replace the existing student union and feature a 16,000-square-foot cafeteria, 3,000-square-foot fitness center, and 8,200-square-foot multipurpose events space. It also will include a student lounge with ample seating, a fireplace, and café.

The building’s roof will feature a trellised deck and fireplace, and other outdoor dining and gathering areas will be constructed around the perimeter of the building to promote student, faculty, and staff interaction.

Designed by HPI Architecture and built by C.W. Driver Companies, the building will reflect a traditional Santa Barbara style that complements the existing architecture on campus, incorporating a smooth plaster finish, limestone veneer, and clay tile roof.

Completion is anticipated for Q4 2019.

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.