Wake County Public School System Completes Numerous Projects

The Wake County Public School System (WCPSS), in central North Carolina, recently completed work across seven facilities. The work was performed during summer 2018 and completed by Dewberry, a privately held professional services firm, in time for students, faculty, and staff to return in mid-August.

Apex Friendship Middle School

The firm’s services included engineering design and construction administration support for mechanical, electrical, plumbing, and fire protection systems for the new three-story Apex Friendship Middle School; window replacements and heating, ventilation, and air conditioning (HVAC) upgrades at Enloe High School; swing space renovation and site work at Wiley Elementary School; wall settlement at Fuquay-Varina Elementary School; concrete settlement at Cary High School; elevator modernizations at Athens Drive High School; and mobile unit installations at Oak View Elementary School.

“Having spent nearly 25 years working with Wake County, my team and I are thrilled to have provided the school system with much needed renovation and expansion design services,” says Dewberry Client Manager Johnny Wood, PE, LEED AP BD+C, CxA, CPD. “As these wrap up, we continue to work on additional projects across the county for further expansions and renovations at different schools.”

Learn more at www.dewberry.com.

Featured

  • Ohio State University Opens 26-Story Hospital

    The Ohio State University Wexner Medical Center recently opened in Columbus, Ohio, standing 26 stories and covering 1.9 million square feet, according to a university news release. The project marks ten years of effort and is the university’s largest single-facility construction project ever.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • abstract illustration of school gym

    How the Gymnasium Can Serve as a Model for Learning Space Design

    Multipurpose gyms work because flexibility was built into the brief from the start, not retrofitted later. The same logic applies to academic spaces.

  • Big Horn Academy

    Big Horn Academy

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Big Horn Academy has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.